Basic Info.
Model NO. |
AY86,AY106,AY126, |
Material |
Steel Wood |
Type |
Pier pillar formwork |
Specification |
Q235B |
Panel thickness |
6mm |
Width |
500-6000mm |
Maxmum lateral pressure |
80 kn/square meter |
Height |
2000mm |
Guardrail height |
1200mm |
Appliation scope |
Roads,Railways,Water conservancy |
Number of Platform |
2m/layer |
Width of Operating Platform |
900mm |
Transport Package |
Package Box, Steel Pallet, Steel Frame, Container |
Brand |
Aoyu |
Origin |
China |
Production Capacity |
14000square meter/Month |
Product Description
Steel Formwork System
Our Viaduct Structural Column Steel Formwork is engineered for strength and durability, making it reusable across multiple construction projects. Its user-friendly assembly and erection process ensures efficiency, while its fixed shape and structure make it ideal for large-scale projects requiring uniform structures, such as high-rise buildings, roads, and bridges.
Packaging:
1. The total net weight of a loaded container generally ranges from 22 to 25 tons, subject to confirmation before loading.
2. We utilize different packaging methods tailored to various products:
---Bundles: Suitable for items like timber beams, steel props, and tie rods.
---Pallet: Small components are packed in bags before being placed on pallets.
---Wooden cases: Available upon customer request for added protection.
---Bulk: Irregular goods are loaded in bulk directly into the container.
Delivery:
1. Production: For a full container, the production period typically spans 20-30 days following receipt of the customer's down payment.
2. Transportation: The delivery timeline varies depending on the destination port.
3. Special requirements may necessitate additional negotiation.
FAQ
Q1: Are you a trading company or a manufacturer?
A: We are a professional stencil-making company with two fully-owned factories.
Q2: What services do you provide?
A: We specialize in designing and manufacturing formwork products specifically for
bridges and tunnels.
Q3: How can you assist us?
A: We provide expert advice, detailed drawings for formwork layout, and competitive quotations to construction project owners, design institutes, and contractors.
B: We supply our high-quality products to contractors, building companies, material suppliers, and trading companies.
C: We extend support to our global peer companies with our exceptional formwork solutions.
Q4: How long does it take to draft a preliminary design and quotation after receiving the structural drawing?
A: Typically, the process takes
3
~7 days, depending on the specific needs of the construction project.
Q5: How long does it take to manufacture the products post-contract signing?
A: Generally, the manufacturing period ranges from 30 to 60 days, depending on the product type and quantity required.
Q6: What are your payment terms?
A: We require a 30% T/T advance payment, with the balance due before shipment.