Basic Info.
Model NO. |
AY86,AY106,AY126, |
Material |
Steel Wood |
Type |
Pier pillar formwork |
Specification |
Q235B |
Panel thickness |
6mm |
Width |
500-6000mm |
Maxmum lateral pressure |
80 kn/square meter |
Height |
2000mm |
Guardrail height |
1200mm |
Appliation scope |
Roads,Railways,Water conservancy |
Number of Platform |
2m/layer |
Width of Operating Platform |
900mm |
Transport Package |
Package Box, Steel Pallet, Steel Frame, Container |
Brand |
Aoyu |
Origin |
China |
Production Capacity |
14000square meter/Month |
Product Description
Steel Formwork System
Our steel formwork system stands out for its unparalleled strength and durability, making it a top choice for repeated use in various construction projects. It is designed for easy assembly and erection, ensuring a smoother construction process. With its fixed shape and structure, this formwork is the ideal solution for projects that require a high volume of uniformly shaped components, such as high-rise buildings, roads, bridges, and more.
Packaging:
1. Typically, the total net weight of a loaded container ranges from 22 to 25 tons. This needs to be confirmed before loading.
2. We use different packaging methods for different products to ensure safety and efficiency:
---Bundles: Suitable for items like timber beams, steel props, and tie rods.
---Pallet: Small parts are bagged and then placed on pallets for organized shipping.
---Wooden cases: Available upon customer request for added protection.
---Bulk: Irregularly shaped goods will be loaded in bulk within the container.
Delivery:
1. Production Timeline: For a full container load, we typically require 20-30 days after receiving the customer's down payment.
2. Transportation: The time frame depends on the destination port and associated charges.
3. Special Requirements: Negotiations are necessary for any special requirements.
FAQ
Q1: Are you a trading company or manufacturer?
A: We are a professional stencil-making company with our own two factories, providing high-quality manufacturing solutions.
Q2: What are your core products and services?
A: We specialize in designing and manufacturing formwork products that are essential for construction projects involving
bridges and tunnels.
Q3: What can you offer us?
A: We provide expert advice, detailed formwork layout drawings, and competitive quotations to project owners, design institutes, and contractors.
B: We supply our high-quality products to contractors, building companies, material suppliers, and trading firms.
C: We support our global peers with outstanding formwork products, ensuring their projects meet the highest standards.
Q4: How long does it take to create a preliminary design and quotation once we provide the structural drawings?
A: Generally, it takes
3
~7 days, depending on the specific requirements of the construction project.
Q5: How long does it take to manufacture the products after the contract is signed?
A: Typically, it takes 30~60 days to produce the required products, depending on their type and quantity.
Q6: What are your terms of payment?
A: A 30% T/T payment in advance is required, with the balance due before shipment.