Basic Info.
Model NO. |
AY86,AY106,AY126, |
Material |
Steel Wood |
Type |
Pier pillar formwork |
Specification |
Q235B |
Panel thickness |
6mm |
Width |
500-6000mm |
Maxmum lateral pressure |
80 kn/square meter |
Height |
2000mm |
Guardrail height |
1200mm |
Appliation scope |
Roads,Railways,Water conservancy |
Number of Platform |
2m/layer |
Width of Operating Platform |
900mm |
Transport Package |
Package Box, Steel Pallet, Steel Frame, Container |
Brand |
Aoyu |
Origin |
China |
Production Capacity |
14000square meter/Month |
Product Description
Steel Formwork System
Our Steel Formwork System is engineered for unparalleled strength and durability, allowing it to be reused multiple times across various construction projects. It boasts ease of assembly and erection, with a fixed shape and structure that makes it perfectly suited for repetitive construction tasks like high-rise buildings, roads, and bridges.
Packaging:
1. The total net weight of a fully loaded container typically ranges from 22 to 25 tons. This needs final confirmation before loading.
2. Various packaging options are available depending on the product:
---Bundles: Ideal for timber beams, steel props, tie rods, etc.
---Pallet: Small components are bagged and then placed on pallets for secure transport.
---Wooden Cases: Available upon customer request for added protection.
---Bulk: Irregularly shaped goods are loaded in bulk within the container.
Delivery:
1. Production: For full container orders, we generally require 20-30 days post receipt of the customer's down payment.
2. Transportation: Delivery time varies depending on the destination port.
3. Special requirements can be discussed and negotiated.
FAQ
Q1: Are you a trading company or manufacturer?
A: We are a professional stencil-making company with two dedicated factories.
Q2: What do you specialize in?
A: We specialize in designing and manufacturing formwork products utilized in
the construction of bridges and tunnels.
Q3: What services can you provide to us?
A: We provide expert suggestions, detailed formwork layout drawings, and competitive quotations to project owners, design institutes, and contractors.
B: We supply our top-tier products to contractors, construction firms, material suppliers, and trading companies.
C: We also support global peers with our premium formwork products.
Q4: How long does it take to prepare a preliminary design and quotation after receiving the structural drawing?
A: Generally, it takes
3
~7 days, depending on the specific requirements of the construction project.
Q5: How long does it take to manufacture the products after the contract is signed?
A: Typically, it takes 30~60 days, contingent on the type and quantity of products ordered.
Q6: What are your payment terms?
A: We require a 30% T/T advance payment, with the balance due before shipment.