Essential Information
Model NO. |
AY86,AY106,AY126, |
Material |
Steel Wood |
Type |
Pier pillar formwork |
Specification |
Q235B |
Panel thickness |
6mm |
Width |
500-6000mm |
Maxmum lateral pressure |
80 kn/square meter |
Height |
2000mm |
Guardrail height |
1200mm |
Appliation scope |
Roads,Railways,Water conservancy |
Number of Platform |
2m/layer |
Width of Operating Platform |
900mm |
Transport Package |
Package Box, Steel Pallet, Steel Frame, Container |
Brand |
Aoyu |
Origin |
China |
Production Capacity |
14000square meter/Month |
Comprehensive Product Overview
Robust Steel Formwork System
Our Steel Formwork exemplifies strength and durability, offering unparalleled reusability in construction projects. The formwork is designed for easy assembly and erection, making it the ideal choice for large-scale projects requiring uniform structures, such as high-rise buildings, roads, and bridges.
Packaging Details:
1. Typically, the total net weight of a loaded container ranges between 22 to 25 tons, which should be verified before loading.
2. Customized packaging solutions for varying products:
---Bundles: Suitable for timber beams, steel props, tie rods, etc.
---Pallet: Small components are packaged in bags and then placed on pallets.
---Wooden Cases: Available upon customer request.
---Bulk: Irregularly shaped goods are loaded in bulk within the container.
Delivery Process:
1. Production Timeline: For full containers, production typically takes 20-30 days post receipt of the customer's down payment.
2. Transportation: Delivery time varies based on the destination port.
3. Special Requirements: Negotiable based on specific needs.
Frequently Asked Questions (FAQ)
Q1: Are you a trading company or a manufacturer?
A: We are a professional stencil manufacturing company with two proprietary factories.
Q2: What services do you offer?
A: We specialize in designing and manufacturing formwork products utilized in
bridges and tunnels.
Q3: How can you assist us?
A: We provide expert suggestions, formwork layout drawings, and quotations to project owners, design institutes, and contractors.
B: We supply our products to contractors, construction firms, material suppliers, and trading companies.
C: We support global peer companies with our exceptional formwork products.
Q4: How long does it take to prepare a brief design and quotation after receiving the structural drawing?
A: Generally, it takes
3
~7 days, depending on the specific project requirements.
Q5: What is the production timeline after contract signing?
A: Typically, it takes 30~60 days to manufacture the products, subject to the type and quantity of the order.
Q6: What are your payment terms?
A: We require a 30% T/T advance payment, with the remaining balance due before shipment.