Basic Info.
Model NO. |
AY86,AY106,AY126, |
Material |
Steel Wood |
Type |
Pier pillar formwork |
Specification |
Q235B |
Panel thickness |
6mm |
Width |
500-6000mm |
Maxmum lateral pressure |
80 kn/square meter |
Height |
2000mm |
Guardrail height |
1200mm |
Appliation scope |
Roads,Railways,Water conservancy |
Number of Platform |
2m/layer |
Width of Operating Platform |
900mm |
Transport Package |
Package Box, Steel Pallet, Steel Frame, Container |
Brand |
Aoyu |
Origin |
China |
Production Capacity |
14000square meter/Month |
Product Description
Steel Formwork System
Our Steel Formwork System is the epitome of strength and durability, designed to be reused multiple times across various construction projects. Effortlessly assembled and erected, its fixed shape and structure make it the ideal solution for large-scale constructions needing uniform shapes, such as high-rise buildings, roads, and bridges.
Packaging:
1. The total net weight of a loaded container generally ranges from 22 to 25 tons; this must be confirmed prior to loading.
2. Tailored packaging solutions for different products:
---Bundles: Suitable for timber beams, steel props, and tie rods.
---Pallets: Small parts are bagged and placed on pallets for secure transport.
---Wooden cases: Available upon customer request for added protection.
---Bulk: Irregularly shaped goods are loaded in bulk within containers.
Delivery:
1. Production: Typically, a full container requires 20-30 days post receipt of down payment for production.
2. Transportation: Delivery time varies based on the destination port's handling time.
3. Special requirements necessitate prior negotiation.
FAQ
Q1: Are you a trading company or manufacturer?
A: We are a specialized stencil manufacturing company with two dedicated factories.
Q2: What services do you provide?
A: We specialize in designing and manufacturing formwork products for
bridge and tunnel constructions.
Q3: How can you assist us?
A: We provide expert suggestions, detailed formwork layout drawings, and competitive quotations to project owners, design institutes, or contractors.
B: We supply our high-quality products to contractors, construction companies, material suppliers, and trading companies.
C: We extend our support to global peer companies with our superior formwork products.
Q4: How long does it take to create a brief design and quotation after we provide the structural drawing?
A: Generally, it takes
3
~7 days, depending on the specific needs of the construction project.
Q5: How long is the manufacturing period after contract signing?
A: Typically, production takes 30~60 days, contingent on the type and quantity of products ordered.
Q6: What are your terms of payment?
A: We require a 30% T/T advance payment, with the remaining balance due before shipment.