• Customized Steel Formwork for Viaduct Building Needs
  • Customized Steel Formwork for Viaduct Building Needs
  • Customized Steel Formwork for Viaduct Building Needs
  • Customized Steel Formwork for Viaduct Building Needs
  • Customized Steel Formwork for Viaduct Building Needs
  • Customized Steel Formwork for Viaduct Building Needs

Customized Steel Formwork for Viaduct Building Needs

After-sales Service: Yes
Warranty: One Year
Certification: ISO
Material: Steel
Type: Column Formwork
ODM or OEM: Yes
Customization:
Manufacturer/Factory
Diamond Member Since 2024

Suppliers with verified business licenses

Beijing, China
High Repeat Buyers Choice
More than 50% of buyers repeatedly choose the supplier
Cooperated with Fortune 500
This supplier has Cooperated with Fortune 500 companies
Patents Awarded
The supplier had awarded 3 patents, you can check the Audit Report for more information
Management Certification
The supplier has quality management system certification, including:
ISO9001:2015 certificate
ISO14001
ISO45001:2018 certificate
to see all verified strength labels (18)

Basic Info.

Model NO.
Column template
Size
Customized
Thickness
Customized
Transport Package
Container
Origin
Aoyu
HS Code
7308900000
Production Capacity
160000square Meters/Year

Product Description

Basic Info.
Model NO. AY86,AY106,AY126, Material Steel Wood
Type Pier pillar formwork Specification Q235B
Panel thickness 6mm Width 500-6000mm
Maxmum lateral pressure 80 kn/square meter Height 2000mm
Guardrail height 1200mm Appliation scope Roads,Railways,Water conservancy
Number of Platform 2m/layer Width of Operating Platform 900mm
Transport Package Package Box, Steel Pallet, Steel Frame, Container Brand Aoyu
Origin China Production Capacity 14000square meter/Month
 

Product Description

Steel Formwork System

Steel formwork is renowned for its strength and durability, making it an indispensable tool in construction, allowing for repeated usage over multiple projects. Its intuitive design ensures it is straightforward to assemble and erect. Its consistent shape and structure make it ideal for construction projects that require numerous identical structures, such as high-rise buildings, roads, and bridges.
Customized Steel Formwork for Viaduct Building Needs
Customized Steel Formwork for Viaduct Building Needs
Customized Steel Formwork for Viaduct Building Needs
Customized Steel Formwork for Viaduct Building Needs
 

Packaging:

1. The total net weight of a fully loaded container typically ranges from 22 to 25 tons. This weight needs to be confirmed before loading.
2. We offer different packaging solutions for various products:
---Bundles: Ideal for timber beams, steel props, tie rods, etc.
---Pallet: Small parts are bagged and then placed on pallets for secure transport.
---Wooden cases: Available upon customer's request for added protection.
---Bulk: Irregularly shaped goods are loaded directly in bulk into the container.
Delivery:
1. Production: For a full container load, we typically require 20-30 days after receiving the customer's down payment to complete production.
2. Transportation: The transportation time varies depending on the destination port's location.
3. Special requirements can be accommodated through prior negotiation.

FAQ
Q1: Are you a trading company or manufacturer?
A: We are a specialized stencil manufacturing company with two dedicated factories.

Q2: What services do you provide?
A: We design and manufacture formwork products specifically tailored forbridge and tunnel construction.

Q3: How can you assist us?
A: We provide expert advice, detailed formwork layout drawings, and comprehensive quotations to project owners, design institutes, or contractors.
B: Our products are available for sale to contractors, construction companies, material suppliers, and trading entities.
C: We proudly support our global counterparts with our superior formwork products.

Q4: How long does it take to draft a preliminary design and quotation after receiving structural drawings?
A: Generally, it takes approximately3
~7 days, depending on the specific requirements of the construction project.

Q5: How long does it take to manufacture the products after the contract is signed?
A: Typically, it takes between 30 to 60 days, depending on the type and quantity of products being produced.

Q6: What are your terms of payment?
A: Our payment terms are 30% T/T in advance, with the remaining balance due before shipment.

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now

You Might Also Like

Diamond Member Since 2024

Suppliers with verified business licenses

Manufacturer/Factory
Plant Area
>2000 square meters
Management System Certification
ISO 9001, ISO 14001