Basic Info.
Model NO. |
AY86,AY106,AY126, |
Material |
Steel Wood |
Type |
Pier pillar formwork |
Specification |
Q235B |
Panel thickness |
6mm |
Width |
500-6000mm |
Maxmum lateral pressure |
80 kn/square meter |
Height |
2000mm |
Guardrail height |
1200mm |
Appliation scope |
Roads,Railways,Water conservancy |
Number of Platform |
2m/layer |
Width of Operating Platform |
900mm |
Transport Package |
Package Box, Steel Pallet, Steel Frame, Container |
Brand |
Aoyu |
Origin |
China |
Production Capacity |
14000square meter/Month |
Product Description
Steel Formwork System
Our steel formwork is renowned for its robustness and longevity, making it perfect for multiple reuses in various construction projects. It is designed for easy assembly and erection. Its fixed shape and structure make it ideal for constructing numerous identical structures, such as high-rise buildings, roads, bridges, and more.
Packaging:
1. Typically, the total net weight of a loaded container is between 22 and 25 tons. This must be verified prior to loading.
2. Different products require different packaging methods:
---Bundles: Used for items like timber beams, steel props, and tie rods.
---Pallet: Small parts are bagged and then placed on pallets.
---Wooden cases: Available upon customer request.
---Bulk: Irregular goods will be loaded in bulk within the container.
Delivery:
1. Production: For a full container, it usually takes 20-30 days after receiving the customer's down payment.
2. Transportation: This depends on the destination port charges.
3. Special requirements necessitate further negotiation.
FAQ
Q1: Are you a trading company or a manufacturer?
A: We are a professional stencil-making company with two of our own factories.
Q2: What services do you provide?
A: We specialize in designing and manufacturing formwork products specifically for
bridges and tunnels.
Q3: How can you assist us in our construction projects?
A: We offer expert suggestions, detailed formwork layout drawings, and competitive quotations to project owners, design institutes, and contractors.
B: We provide our products to contractors, building companies, material suppliers, and trading firms.
C: We proudly support our global peers with our top-notch formwork products.
Q4: How long does it take to create a brief design and quotation after we provide the structural drawing?
A: Generally, it takes
3
~7 days depending on the specific requirements of the construction project.
Q5: How long does it take to manufacture the products once the contract is signed?
A: Typically, it takes 30~60 days based on the type and volume of products to be manufactured.
Q6: What are your terms of payment?
A: 30% T/T in advance, with the balance due before shipment.