Basic Information:
Model NO. |
AY86,AY106,AY126, |
Material |
Steel Wood |
Type |
Pier pillar formwork |
Specification |
Q235B |
Panel thickness |
6mm |
Width |
500-6000mm |
Maxmum lateral pressure |
80 kn/square meter |
Height |
2000mm |
Guardrail height |
1200mm |
Appliation scope |
Roads,Railways,Water conservancy |
Number of Platform |
2m/layer |
Width of Operating Platform |
900mm |
Transport Package |
Package Box, Steel Pallet, Steel Frame, Container |
Brand |
Aoyu |
Origin |
China |
Production Capacity |
14000square meter/Month |
Product Description:
Steel Formwork System:
Our Steel Formwork System is engineered for strength and durability, designed to be reused multiple times across construction projects. Its easy assembly and erection process, coupled with a fixed shape and structure, make it ideal for projects requiring a large quantity of similar shapes, such as high-rise buildings, roads, and bridges.
Packaging:
1. Typically, the total net weight of a loaded container ranges from 22 tons to 25 tons, which must be confirmed prior to loading.
2. We use various packaging methods depending on the product:
---Bundles: Suitable for timber beams, steel props, tie rods, etc.
---Pallets: Small parts are placed in bags before being set on pallets.
---Wooden Cases: Available upon customer's request.
---Bulk: Irregular goods are loaded in bulk into containers.
Delivery:
1. Production: For a full container, we typically require 20-30 days after receiving the customer's down payment.
2. Transportation: The duration depends on the destination port.
3. Special requirements may require negotiation.
Frequently Asked Questions (FAQ):
Q1: Are you a trading company or manufacturer?
A: We are a professional stencil-making company with two factories of our own.
Q2: What services do you offer?
A: We specialize in designing and manufacturing formwork products for
bridges and tunnels.
Q3: How can you assist us?
A: We provide suggestions, formwork layout drawings, and quotations to project owners, design institutes, and contractors.
B: We sell our products to contractors, construction firms, material suppliers, and trading companies.
C: We support our global peers with our exceptional formwork products.
Q4: How long does it take to create a brief design and quotation after we provide the structural drawing?
A: Generally, it takes
3
~7 days depending on the specific project requirements.
Q5: How long does it take to manufacture the products after contract signing?
A: Typically, it takes 30~60 days, depending on the type and quantity of the products to be manufactured.
Q6: What are your payment terms?
A: 30% T/T in advance, with the balance due before shipment.