Basic Info.
Model NO. |
AY86,AY106,AY126, |
Material |
Steel Wood |
Type |
Pier pillar formwork |
Specification |
Q235B |
Panel thickness |
6mm |
Width |
500-6000mm |
Maxmum lateral pressure |
80 kn/square meter |
Height |
2000mm |
Guardrail height |
1200mm |
Appliation scope |
Roads,Railways,Water conservancy |
Number of Platform |
2m/layer |
Width of Operating Platform |
900mm |
Transport Package |
Package Box, Steel Pallet, Steel Frame, Container |
Brand |
Aoyu |
Origin |
China |
Production Capacity |
14000square meter/Month |
Product Description
Steel Formwork System
Our robust and resilient steel formwork is built to withstand the rigors of construction, ensuring multiple reuses. It offers effortless assembly and erection, making it the perfect choice for projects requiring uniform shapes like high-rise buildings, roads, and bridges.
Packaging:
1. Typically, the total net weight for a loaded container ranges between 22 to 25 tons. This must be confirmed prior to loading.
2. Customized packaging solutions for diverse products:
---Bundles: Suitable for timber beams, steel props, tie rods, etc.
---Pallet: Smaller parts are bagged and then placed on pallets.
---Wooden cases: Available upon customer request.
---Bulk: Irregularly shaped goods are loaded in bulk within the container.
Delivery:
1. Production: For a full container, it generally takes 20-30 days after receiving the customer's down payment.
2. Transportation: Duration varies depending on the destination port.
3. Special requirements may necessitate additional negotiation.
FAQ
Q1: Are you a trading company or a manufacturer?
A: We are a renowned stencil manufacturing company with two dedicated factories.
Q2: What services do you provide?
A: We specialize in designing and manufacturing formwork products utilized for
bridges and tunnels.
Q3: What can you offer us?
A: We provide expert advice, detailed formwork layout drawings, and competitive quotations to project owners, design institutes, and contractors.
B: We sell our premium products to contractors, construction firms, material suppliers, and trading companies.
C: We support our global peers with our top-tier formwork products.
Q4: How long does it take to create a brief design and quotation after receiving the structural drawing?
A: Generally, it takes
3
~7 days, depending on the specific requirements of the construction project.
Q5: How long does manufacturing take after signing the contract?
A: Typically, it takes 30~60 days, depending on the type and quantity of products to be produced.
Q6: What are your payment terms?
A: 30% T/T in advance, with the balance due before shipment.