Basic Info.
Model NO. |
AY86,AY106,AY126, |
Material |
Steel Wood |
Type |
Pier pillar formwork |
Specification |
Q235B |
Panel thickness |
6mm |
Width |
500-6000mm |
Maxmum lateral pressure |
80 kn/square meter |
Height |
2000mm |
Guardrail height |
1200mm |
Appliation scope |
Roads,Railways,Water conservancy |
Number of Platform |
2m/layer |
Width of Operating Platform |
900mm |
Transport Package |
Package Box, Steel Pallet, Steel Frame, Container |
Brand |
Aoyu |
Origin |
China |
Production Capacity |
14000square meter/Month |
Product Description
Steel Formwork System
Our robust and durable steel formwork system can be reused multiple times in construction, offering unmatched longevity. Easy to assemble and erect, this system is perfect for projects requiring numerous identical structures, such as high-rise buildings, roads, and bridges.
Packaging:
1. The total net weight for a fully loaded container ranges from 22 to 25 tons, which must be confirmed prior to loading.
2. Different products require distinct packaging solutions:
---Bundles: Ideal for timber beams, steel props, tie rods, etc.
---Pallet: Smaller components are bagged and placed on pallets for secure transportation.
---Wooden cases: Available upon customer request for additional protection.
---Bulk: Irregularly shaped items will be loaded in bulk within the container.
Delivery:
1. Production: For a full container, production typically takes 20-30 days following receipt of the customer's down payment.
2. Transportation: Duration is contingent upon the destination port.
3. Special requirements necessitate further negotiation.
FAQ
Q1: Are you a trading company or a manufacturer?
A: We are a professional stencil-making company with two fully operational factories.
Q2: What services do you offer?
A: We specialize in designing and manufacturing formwork products for
bridges and tunnels.
Q3: What can your company do for us?
A: We provide expert suggestions, detailed formwork layout drawings, and competitive quotations to owners, design institutes, or contractors of construction projects.
B: We sell our premium products to contractors, building companies, material suppliers, and trading companies.
C: We support our global peers with our superior formwork products.
Q4: How long does it take to provide a brief design and quotation after receiving the structural drawing?
A: Typically, it takes
3
-7 days, depending on the specific requirements of the construction project.
Q5: How long does it take to manufacture the products after signing the contract?
A: Generally, it takes 30-60 days, depending on the type and quantity of products ordered.
Q6: What are your terms of payment?
A: We require 30% T/T in advance, with the balance due before shipment.