Basic Info.
Model NO. |
AY86,AY106,AY126, |
Material |
Steel Wood |
Type |
Pier pillar formwork |
Specification |
Q235B |
Panel thickness |
6mm |
Width |
500-6000mm |
Maxmum lateral pressure |
80 kn/square meter |
Height |
2000mm |
Guardrail height |
1200mm |
Appliation scope |
Roads,Railways,Water conservancy |
Number of Platform |
2m/layer |
Width of Operating Platform |
900mm |
Transport Package |
Package Box, Steel Pallet, Steel Frame, Container |
Brand |
Aoyu |
Origin |
China |
Production Capacity |
14000square meter/Month |
Product Description
Steel Formwork System
Our steel formwork system is crafted to be robust and durable, ensuring multiple reuses in construction projects. Designed for easy assembly and erection, its fixed shape and structure make it perfect for projects requiring large quantities of same-shaped structures, such as high-rise buildings, roads, and bridges.
Packaging:
1. The total net weight of a loaded container generally ranges from 22 tons to 25 tons, which needs to be confirmed prior to loading.
2. We utilize different packaging methods for various products:
---Bundles: Ideal for timber beams, steel props, tie rods, and similar items.
---Pallet: Smaller parts are placed in bags before being stacked on pallets.
---Wooden cases: Available upon customer request for added protection.
---Bulk: Irregularly shaped goods are loaded in bulk within the container.
Delivery:
1. Production: For a full container, production typically requires 20-30 days after receiving the customer's down payment.
2. Transportation: The delivery time varies depending on the destination charge port.
3. Special requirements are subject to negotiation.
FAQ
Q1: Are you a trading company or manufacturer?
A: We are a professional stencil-making company, operating with our own two factories.
Q2: What is your area of expertise?
A: We specialize in designing and manufacturing formwork products for
applications in bridges and tunnels.
Q3: What services do you offer?
A: We provide expert suggestions, formwork layout drawings, and competitive quotations to owners, design institutes, and contractors involved in construction projects.
B: We supply our products to contractors, building companies, material suppliers, and trading entities.
C: We support our global peers with our superior formwork products.
Q4: How long does it take to provide a brief design and quotation after receiving the structural drawing?
A: On average, it takes
3
~7 days, depending on the specific requirements of the construction project.
Q5: How long does it take to manufacture the products after signing the contract?
A: Typically, manufacturing takes 30~60 days, depending on the type and quantity of the products required.
Q6: What are your terms of payment?
A: Our payment terms are 30% T/T in advance, with the balance due before shipment.