Basic Info.
Model NO. |
AY86,AY106,AY126, |
Material |
Steel Wood |
Type |
Pier pillar formwork |
Specification |
Q235B |
Panel thickness |
6mm |
Width |
500-6000mm |
Maxmum lateral pressure |
80 kn/square meter |
Height |
2000mm |
Guardrail height |
1200mm |
Appliation scope |
Roads,Railways,Water conservancy |
Number of Platform |
2m/layer |
Width of Operating Platform |
900mm |
Transport Package |
Package Box, Steel Pallet, Steel Frame, Container |
Brand |
Aoyu |
Origin |
China |
Production Capacity |
14000square meter/Month |
Product Description
Steel Formwork System
Our Steel formwork system is a paragon of strength and durability, designed for repeated use in varied construction projects. Its user-friendly assembly and erection make it ideal for projects demanding uniformity in structure, such as high-rise buildings, roads, and bridges. Secure and robust, it ensures consistent performance across multiple uses.
Packaging:
1. Typically, the net weight for a loaded container ranges between 22 to 25 tons. This must be confirmed before loading.
2. We tailor our packaging methods to suit different products:
---Bundles: Ideal for timber beams, steel props, and tie rods.
---Pallet: Smaller parts are bagged and then placed on pallets for easy handling.
---Wooden cases: Available upon customer request for added protection.
---Bulk: Irregular items are loaded in bulk within the container.
Delivery:
1. Production: For a full container, production typically takes 20-30 days post receipt of the customer's down payment.
2. Transportation: Delivery times vary based on the destination port.
3. Special requirements are negotiable.
FAQ
Q1: Are you a trading company or a manufacturer?
A: We are a premier stencil making company with two dedicated factories.
Q2: What products do you specialize in?
A: We specialize in the design and manufacture of formwork products used for
bridges and tunnels.
Q3: How can you support our projects?
A: We provide expert suggestions, detailed formwork layout drawings, and competitive quotations to project owners, design institutes, or contractors.
B: We supply our high-quality products to contractors, construction companies, material suppliers, and trading firms.
C: We also offer our superior formwork products to peer companies worldwide.
Q4: How long does it take to provide a brief design and quotation after receiving the structural drawing?
A: Generally, it takes
3
~7 days, depending on the specific project requirements.
Q5: How long does it take to manufacture the products post contract signing?
A: Typically, manufacturing takes 30~60 days, depending on the product type and quantity required.
Q6: What are your payment terms?
A: We require 30% T/T in advance, with the balance due before shipment.