Basic Info.
Model NO. |
AY86,AY106,AY126, |
Material |
Steel Wood |
Type |
Pier pillar formwork |
Specification |
Q235B |
Panel thickness |
6mm |
Width |
500-6000mm |
Maxmum lateral pressure |
80 kn/square meter |
Height |
2000mm |
Guardrail height |
1200mm |
Appliation scope |
Roads,Railways,Water conservancy |
Number of Platform |
2m/layer |
Width of Operating Platform |
900mm |
Transport Package |
Package Box, Steel Pallet, Steel Frame, Container |
Brand |
Aoyu |
Origin |
China |
Production Capacity |
14000square meter/Month |
Product Description
Steel Formwork System
Steel formwork is renowned for its strength and durability, making it an ideal choice for repeated use in construction projects. Its ease of assembly and erection paired with a fixed shape and structure makes it perfect for projects requiring uniform structures, such as high-rise buildings, roads, and bridges.
Packaging:
1. Typically, the total net weight of a loaded container ranges from 22 to 25 tons, a parameter that must be confirmed prior to loading.
2. Packaging varies according to product type:
---Bundles: Suited for timber beams, steel props, tie rods, etc.
---Pallet: Smaller parts are bagged and placed on pallets.
---Wooden Cases: Available upon customer's request.
---Bulk: Irregular goods are loaded in bulk within the container.
Delivery:
1. Production: For a full container, we generally require 20-30 days after receiving the customer's down payment.
2. Transportation: Delivery time depends on the destination port.
3. Special requirements necessitate negotiation.
FAQ
Q1: Are you a trading company or manufacturer?
A: We are a professional stencil manufacturing company with two proprietary factories.
Q2: What do you do?
A: We specialize in designing and manufacturing formwork products for
bridges and tunnels.
Q3: What services can you provide for us?
A: We offer expert advice, formwork layout drawings, and detailed quotations to construction project owners, design institutes, and contractors.
B: We supply our products to contractors, building companies, material suppliers, and trading companies.
C: We support our global peer companies with top-quality formwork products.
Q4: How long does it take to create a brief design and quotation after we provide the structural drawing?
A: Generally, it takes
3
~7 days based on the specific requirements of the construction project.
Q5: How long does it take to manufacture the products after contract signing?
A: It generally takes 30~60 days depending on the type and quantity of products being manufactured.
Q6: What are your terms of payment?
A: 30% T/T in advance, with the balance due before shipment.