Basic Info.
Model NO. |
AY86,AY106,AY126, |
Material |
Steel Wood |
Type |
Pier pillar formwork |
Specification |
Q235B |
Panel thickness |
6mm |
Width |
500-6000mm |
Maxmum lateral pressure |
80 kn/square meter |
Height |
2000mm |
Guardrail height |
1200mm |
Appliation scope |
Roads,Railways,Water conservancy |
Number of Platform |
2m/layer |
Width of Operating Platform |
900mm |
Transport Package |
Package Box, Steel Pallet, Steel Frame, Container |
Brand |
Aoyu |
Origin |
China |
Production Capacity |
14000square meter/Month |
Product Description
Steel Formwork System
The Viaduct Construction Steel Formwork System from Beijing Aoyu Template Co., Ltd. is engineered with robustness and durability in mind, allowing for multiple reuses in various construction projects. Its user-friendly assembly and erection make it an ideal solution for projects requiring uniform structural shapes, such as high-rise buildings, roads, and bridges.
Packaging:
1. Typically, the total net weight of a loaded container ranges between 22 to 25 tons. This must be confirmed prior to loading.
2. Various products require different packaging methods:
---Bundles: Suitable for timber beams, steel props, tie rods, etc.
---Pallet: Smaller parts are placed in bags and then arranged on pallets.
---Wooden cases: Available upon the customer's request.
---Bulk: Irregularly shaped goods will be loaded in bulk within the container.
Delivery:
1. Production: For a full container, we generally require 20-30 days post receipt of the customer's down payment.
2. Transportation: Duration is contingent upon the destination port.
3. Special requirements may necessitate further negotiation.
FAQ
Q1: Are you a trading company or manufacturer?
A: We are a professional stencil-making company with two dedicated factories at our disposal.
Q2: What services do you provide?
A: We specialize in designing and manufacturing formwork products for
bridges and tunnels.
Q3: What can you offer us?
A: We provide expert suggestions, detailed formwork layout drawings, and competitive quotations to project owners, design institutes, and contractors.
B: We supply our formwork products to contractors, construction firms, material suppliers, and trading companies.
C: Our top-tier formwork products are also available to support our global industry peers.
Q4: How long does it take to prepare a preliminary design and quotation after we submit the structural drawing?
A: Generally, it takes
3
~7 days, depending on the specific requirements of the construction project.
Q5: How long does it take to manufacture the products after the contract is signed?
A: Typically, it takes 30~60 days, based on the type and quantity of products to be manufactured.
Q6: What are your payment terms?
A: We require 30% T/T in advance, with the balance due before shipment.