Basic Info.
Model NO. |
AY86,AY106,AY126, |
Material |
Steel Wood |
Type |
Pier pillar formwork |
Specification |
Q235B |
Panel thickness |
6mm |
Width |
500-6000mm |
Maxmum lateral pressure |
80 kn/square meter |
Height |
2000mm |
Guardrail height |
1200mm |
Appliation scope |
Roads,Railways,Water conservancy |
Number of Platform |
2m/layer |
Width of Operating Platform |
900mm |
Transport Package |
Package Box, Steel Pallet, Steel Frame, Container |
Brand |
Aoyu |
Origin |
China |
Production Capacity |
14000square meter/Month |
Product Description
Steel Formwork System
Our Steel Formwork is robust and built to last, ensuring it can be reused multiple times throughout the construction process. It boasts easy assembly and erection, making it a favorite among professionals. With a fixed shape and structure, it is ideal for projects requiring numerous identical components, such as high-rise buildings, roads, and bridges.
Packaging:
1. The total net weight of a loaded container generally ranges from 22 to 25 tons, which must be confirmed before loading.
2. We use different packaging methods for various products:
---Bundles: Timber beams, steel props, tie rods, etc.
---Pallet: Small parts are placed in bags and then on pallets.
---Wooden cases: Available upon customer request.
---Bulk: Irregular goods may be loaded in bulk in the container.
Delivery:
1. Production: For a full container, we typically require 20-30 days after receiving the customer's down payment.
2. Transportation: The duration depends on the destination port.
3. Special requirements may need additional negotiation.
FAQ
Q1: Are you a trading company or manufacturer?
A: We are a professional stencil-making company with our own two factories.
Q2: What do you do?
A: We design and manufacture formwork products used for
bridges and tunnels.
Q3: What can you do for us?
A: We provide suggestions, formwork layout drawings, and quotations to project owners, design institutes, and contractors.
B: We sell our products to contractors, building companies, material suppliers, and trading companies.
C: We support our worldwide peers with our high-quality formwork products.
Q4: How long does it take to create a brief design and quotation after we provide the structural drawing?
A: Generally, it takes
3
~7 days, depending on the specific requirements of the construction project.
Q5: How long does it take to manufacture the products after signing the contract?
A: Typically, it takes 30~60 days, depending on the type and quantity of products to be produced.
Q6: What are your terms of payment?
A: 30% T/T in advance, balance before shipment.