Basic Info.
Model NO. |
AY86,AY106,AY126, |
Material |
Steel Wood |
Type |
Pier pillar formwork |
Specification |
Q235B |
Panel thickness |
6mm |
Width |
500-6000mm |
Maxmum lateral pressure |
80 kn/square meter |
Height |
2000mm |
Guardrail height |
1200mm |
Appliation scope |
Roads,Railways,Water conservancy |
Number of Platform |
2m/layer |
Width of Operating Platform |
900mm |
Transport Package |
Package Box, Steel Pallet, Steel Frame, Container |
Brand |
Aoyu |
Origin |
China |
Production Capacity |
14000square meter/Month |
Product Description
Steel Formwork System
Our Steel Formwork system exemplifies strength and durability, ensuring numerous reuses in construction projects. Easy to assemble and erect, its fixed shape and structure make it ideal for high-quantity, same-shaped structures such as high-rise buildings, roads, and bridges.
Packaging:
1. Typically, the net weight of a fully loaded container ranges from 22 to 25 tons, subject to confirmation prior to loading.
2. Packaging varies by product type:
---Bundles: Includes timber beams, steel props, tie rods, etc.
---Pallet: Smaller parts are bagged and then placed on pallets.
---Wooden cases: Available upon customer request.
---Bulk: Irregular goods are loaded in bulk within the container.
Delivery:
1. Production: For a full container, we generally require 20-30 days post receipt of the customer's down payment.
2. Transportation: Duration depends on the destination port.
3. Special requirements require negotiation.
FAQ
Q1: Are you a trading company or manufacturer?
A: We are a professional stencil-making company with two dedicated factories.
Q2: What do you do?
A: We specialize in designing and manufacturing formwork products.
bridges and tunnels.
Q3: What services do you offer?
A: We provide expert suggestions, detailed formwork layout drawings, and competitive quotations for construction project owners, design institutes, and contractors.
B: We supply our products to contractors, building companies, material suppliers, and trading companies.
C: We extend support to our global peers with our exceptional formwork products.
Q4: How long does it take to provide a preliminary design and quotation after receiving the structural drawing?
A: Generally, it takes
3
~7 days, depending on specific construction project requirements.
Q5: How long does it take to manufacture the products post contract signing?
A: Typically, it requires 30~60 days, based on the type and quantity of products ordered.
Q6: What are your payment terms?
A: 30% T/T in advance, with the balance due before shipment.