Basic Info.
Model NO. |
AY86,AY106,AY126, |
Material |
Steel Wood |
Type |
Pier pillar formwork |
Specification |
Q235B |
Panel thickness |
6mm |
Width |
500-6000mm |
Maxmum lateral pressure |
80 kn/square meter |
Height |
2000mm |
Guardrail height |
1200mm |
Appliation scope |
Roads,Railways,Water conservancy |
Number of Platform |
2m/layer |
Width of Operating Platform |
900mm |
Transport Package |
Package Box, Steel Pallet, Steel Frame, Container |
Brand |
Aoyu |
Origin |
China |
Production Capacity |
14000square meter/Month |
Product Description
Steel Formwork System
Our Steel Formwork System offers unmatched strength and durability, making it an ideal choice for repeated use in various construction projects. It is designed for effortless assembly and erection, and its predefined shape and structure make it perfect for applications requiring numerous identical structures, such as high-rise buildings, roads, and bridges.
Packaging:
1. Typically, the total net weight of a loaded container ranges from 22 to 25 tons. This must be confirmed prior to loading.
2. We use different packaging methods depending on the product:
---Bundles: Used for items like timber beams, steel props, and tie rods.
---Pallet: Smaller parts are placed in bags and then arranged on pallets.
---Wooden cases: Available upon customer request.
---Bulk: Irregular goods are loaded in bulk within the container.
Delivery:
1. Production: For a full container, production generally takes 20-30 days after receipt of the customer's down payment.
2. Transportation: The duration depends on the destination port.
3. Special requirements can be discussed and negotiated.
FAQ
Q1: Are you a trading company or manufacturer?
A: We are a professional stencil-making company with our own two factories.
Q2: What do you do?
A: We specialize in designing and manufacturing formwork products used in
bridge and tunnel construction.
Q3: What can you do for us?
A: We provide expert advice, formwork layout drawings, and quotations to project owners, design institutes, and contractors.
B: We sell our products to contractors, building companies, material suppliers, and trading companies.
C: We support our global peers with high-quality formwork products.
Q4: How long does it take to create a brief design and quotation after receiving the structural drawing?
A: Generally, it takes
3
~7 days, depending on the project's specific requirements.
Q5: How long does it take to manufacture the products after signing the contract?
A: Typically, it takes 30~60 days based on the type and quantity of products needed.
Q6: What are your terms of payment?
A: 30% T/T in advance, with the balance due before shipment.