Basic Info.
Model NO. |
AY86,AY106,AY126, |
Material |
Steel Wood |
Type |
Pier pillar formwork |
Specification |
Q235B |
Panel thickness |
6mm |
Width |
500-6000mm |
Maxmum lateral pressure |
80 kn/square meter |
Height |
2000mm |
Guardrail height |
1200mm |
Appliation scope |
Roads,Railways,Water conservancy |
Number of Platform |
2m/layer |
Width of Operating Platform |
900mm |
Transport Package |
Package Box, Steel Pallet, Steel Frame, Container |
Brand |
Aoyu |
Origin |
China |
Production Capacity |
14000square meter/Month |
Product Description
Steel Formwork System
Our Steel Formwork is a pinnacle of strength and durability, making it perfect for repeated use in diverse construction projects. Its intuitive assembly and erection process, combined with its fixed shape and robust structure, make it ideal for large-scale projects requiring uniform structures such as high-rise buildings, roads, and bridges.
Packaging:
1. The total net weight of a loaded container typically ranges from 22 to 25 tons and must be confirmed before loading.
2. We use various packaging methods for different products:
---Bundles: Ideal for timber beams, steel props, and tie rods.
---Pallet: Small parts are placed in bags and then secured on pallets.
---Wooden cases: Available upon customer's request for additional protection.
---Bulk: Irregular goods are loaded in bulk within the container.
Delivery:
1. Production: Full container orders typically require 20-30 days post receipt of down payment.
2. Transportation: Delivery time varies depending on the destination port.
3. Special requirements necessitate further negotiation.
FAQ
Q1: Are you a trading company or manufacturer?
A: We are a professional stencil-making company with two dedicated manufacturing facilities.
Q2: What services do you offer?
A: We specialize in designing and manufacturing formwork products tailored for
bridges and tunnels.
Q3: How can you assist us?
A: We provide expert suggestions, detailed formwork layout drawings, and comprehensive quotations to project owners, design institutes, and contractors.
B: Our products are sold to contractors, construction firms, material suppliers, and trading companies.
C: We also support our global peers with our superior formwork products.
Q4: How long does it take to create a preliminary design and quotation once we provide the structural drawing?
A: Typically, it takes
3
~7 days, contingent on the construction project's specific requirements.
Q5: How long does it take to produce the products after contract signing?
A: Generally, it takes 30~60 days, depending on the product type and quantity.
Q6: What are your payment terms?
A: We require a 30% T/T in advance, with the balance due before shipment.