Basic Info.
Model NO. |
AY86,AY106,AY126, |
Material |
Steel Wood |
Type |
Pier pillar formwork |
Specification |
Q235B |
Panel thickness |
6mm |
Width |
500-6000mm |
Maxmum lateral pressure |
80 kn/square meter |
Height |
2000mm |
Guardrail height |
1200mm |
Appliation scope |
Roads,Railways,Water conservancy |
Number of Platform |
2m/layer |
Width of Operating Platform |
900mm |
Transport Package |
Package Box, Steel Pallet, Steel Frame, Container |
Brand |
Aoyu |
Origin |
China |
Production Capacity |
14000square meter/Month |
Product Description
Steel Formwork System
Our Heavy-Duty Steel Formwork System is built for strength and durability, ensuring it can be reused multiple times in various construction projects. Its easy assembly and pre-defined shape make it ideal for high-rise buildings, roads, and bridges where uniformity is key.
Packaging:
1. Typically, the net weight of a loaded container ranges between 22 to 25 tons. This must be confirmed prior to loading.
2. We offer various packaging solutions tailored to different products:
---Bundles: Ideal for timber beams, steel props, tie rods, etc.
---Pallet: Smaller parts are bagged and placed on pallets for secure transport.
---Wooden cases: Available upon customer's request for additional protection.
---Bulk: Irregularly shaped goods are loaded in bulk within the container.
Delivery:
1. Production: For a full container, production typically takes 20-30 days from the receipt of the customer's down payment.
2. Transportation: The delivery time varies based on the destination port.
3. Special requirements are subject to negotiation.
FAQ
Q1: Are you a trading company or manufacturer?
A: We are a professional stencil making company with two dedicated factories.
Q2: What do you do?
A: We specialize in the design and manufacture of formwork products for
bridges and tunnels.
Q3: What can you do for us?
A: We provide expert suggestions, detailed drawings of formwork layouts, and competitive quotations for project owners, design institutes, or contractors.
B: We sell our high-quality products to contractors, building companies, material suppliers, and trading companies.
C: We support our peers worldwide with our exceptional formwork products.
Q4: How long does it take to make a preliminary design and quotation after we provide the structural drawing?
A: Typically, it takes
3
~7 days, depending on the specific requirements of the construction project.
Q5: How long does it take to manufacture the products after signing the contract?
A: Generally, it takes 30~60 days, depending on the type and quantity of products ordered.
Q6: What are your terms of payment?
A: A 30% T/T advance payment is required, with the balance due before shipment.