Basic Info.
Model NO. |
AY86,AY106,AY126, |
Material |
Steel Wood |
Type |
Pier pillar formwork |
Specification |
Q235B |
Panel thickness |
6mm |
Width |
500-6000mm |
Maxmum lateral pressure |
80 kn/square meter |
Height |
2000mm |
Guardrail height |
1200mm |
Appliation scope |
Roads,Railways,Water conservancy |
Number of Platform |
2m/layer |
Width of Operating Platform |
900mm |
Transport Package |
Package Box, Steel Pallet, Steel Frame, Container |
Brand |
Aoyu |
Origin |
China |
Production Capacity |
14000square meter/Month |
Product Description
Steel Formwork System
Our Steel Formwork System is engineered for exceptional strength and durability, ensuring it can be reused multiple times across various construction projects. It is designed for easy assembly and erection, making it ideal for repetitive infrastructure requirements such as high-rise buildings, roads, and bridges where consistency and reliability are paramount.
Packaging:
1. Typically, the net weight of a loaded container ranges from 22 to 25 tons, and this must be confirmed prior to loading.
2. Diverse packaging options are tailored to different products:
---Bundles: Includes items like timber beams, steel props, and tie rods.
---Pallet: Smaller parts are bagged and placed on pallets for secure transport.
---Wooden Cases: Available upon customer request for additional protection.
---Bulk: Irregularly shaped goods may be loaded in bulk within the container.
Delivery:
1. Production: For a full container, the typical production time is 20-30 days following receipt of the customer's down payment.
2. Transportation: The delivery timeframe varies based on the destination port.
3. Special requirements will be addressed through negotiation.
FAQ
Q1: Are you a trading company or manufacturer?
A: We are a professional stencil-making company with two dedicated factories.
Q2: What do you do?
A: We specialize in designing and manufacturing formwork products primarily used for
infrastructure projects like bridges and tunnels.
Q3: What services can you provide for us?
A: We offer expert suggestions, comprehensive formwork layout drawings, and competitive quotations to project owners, design institutes, and contractors.
B: We supply our formwork products to contractors, construction companies, material suppliers, and trading firms.
C: We also support our global peers with our top-tier formwork solutions.
Q4: How long does it take to create a brief design and quotation after receiving the structural drawing?
A: Generally, it takes
3
~7 days depending on the specific project requirements.
Q5: How long does it take to manufacture the products after the contract is signed?
A: It typically takes 30~60 days based on the type and quantity of the products being manufactured.
Q6: What are your terms of payment?
A: Our payment terms are 30% T/T in advance, with the balance due before shipment.