Basic Info.
Model NO. |
AY86,AY106,AY126, |
Material |
Steel Wood |
Type |
Pier pillar formwork |
Specification |
Q235B |
Panel thickness |
6mm |
Width |
500-6000mm |
Maxmum lateral pressure |
80 kn/square meter |
Height |
2000mm |
Guardrail height |
1200mm |
Appliation scope |
Roads,Railways,Water conservancy |
Number of Platform |
2m/layer |
Width of Operating Platform |
900mm |
Transport Package |
Package Box, Steel Pallet, Steel Frame, Container |
Brand |
Aoyu |
Origin |
China |
Production Capacity |
14000square meter/Month |
Product Description
Steel Formwork System
Our Steel Formwork is designed with strength and durability in mind, ensuring it can be reused multiple times, making it a cost-effective solution for construction. It's easy to assemble and erect, with a fixed shape and structure that makes it perfect for projects requiring uniformity, such as high-rise buildings, roads, bridges, and more.
Packaging:
1. Generally, the total net weight of a loaded container ranges from 22 to 25 tons. This needs to be confirmed before loading.
2. Different packaging methods are used for various products:
---Bundles: Ideal for timber beams, steel props, tie rods, etc.
---Pallet: Smaller parts are placed in bags before being set on pallets.
---Wooden cases: Available upon customer's request for added protection.
---Bulk: Irregular goods are loaded in bulk within the container.
Delivery:
1. Production: For a full container, we typically require 20-30 days from the receipt of the customer's down payment.
2. Transportation: Duration depends on the destination port.
3. Special requirements necessitate negotiation.
FAQ
Q1: Are you a trading company or manufacturer?
A: We are a professional stencil-making company with our own two factories.
Q2: What do you do?
A: We specialize in the design and manufacture of formwork products used primarily for
bridges and tunnels.
Q3: What can you do for us?
A: We offer expert suggestions, detailed drawings of formwork layouts, and competitive quotations for construction project stakeholders including owners, design institutes, and contractors.
B: We sell our premium products to contractors, building companies, material suppliers, and trading companies.
C: Our exceptional formwork products support our peers worldwide.
Q4: How long does it take to provide a brief design and quotation after receiving the structural drawing?
A: Generally, it takes
3
~7 days based on the specific requirements of the construction project.
Q5: How long does it take to manufacture the products after signing the contract?
A: Typically, it takes 30~60 days depending on the type and quantity of products.
Q6: What are your terms of payment?
A: We require 30% T/T in advance, with the balance due before shipment.