Basic Info.
Model NO. |
AY86,AY106,AY126, |
Material |
Steel Wood |
Type |
Pier pillar formwork |
Specification |
Q235B |
Panel thickness |
6mm |
Width |
500-6000mm |
Maxmum lateral pressure |
80 kn/square meter |
Height |
2000mm |
Guardrail height |
1200mm |
Appliation scope |
Roads,Railways,Water conservancy |
Number of Platform |
2m/layer |
Width of Operating Platform |
900mm |
Transport Package |
Package Box, Steel Pallet, Steel Frame, Container |
Brand |
Aoyu |
Origin |
China |
Production Capacity |
14000square meter/Month |
Product Description
Steel Formwork System
Steel formwork, known for its robust and durable nature, can be reused multiple times in construction projects. It boasts ease of assembly and erection, making it an ideal choice for projects requiring numerous identical structures, such as high-rise buildings, roads, and bridges.
Packaging:
1. Typically, the total net weight of a loaded container ranges from 22 to 25 tons, which must be confirmed prior to loading.
2. Various packaging methods cater to different products:
---Bundles: Suitable for timber beams, steel props, tie rods, etc.
---Pallet: Small parts are bagged and then placed on pallets.
---Wooden cases: Available upon customer request.
---Bulk: Irregular goods are loaded in bulk within the container.
Delivery:
1. Production: For a full container load, we typically require 20-30 days after receiving the customer's down payment.
2. Transportation: This depends on the destination charge port.
3. Special requirements necessitate further negotiation.
FAQ
Q1: Are you a trading company or manufacturer?
A: We are a professional stencil manufacturing company with two dedicated factories.
Q2: What services do you provide?
A: We specialize in designing and manufacturing formwork products used in
bridge and tunnel construction.
Q3: What can your company offer us?
A: We provide expert suggestions, formwork layout drawings, and quotations to project owners, design institutes, or contractors.
B: We sell our high-quality products to contractors, construction companies, material suppliers, or trading companies.
C: We support our global peers by offering our exceptional formwork products.
Q4: How long does it take to generate a brief design and quotation after we provide the structural drawing?
A: Generally, it takes
3
~7 days, depending on the specific requirements of your construction project.
Q5: How long does it take to manufacture the products after contract signing?
A: Typically, it takes 30~60 days based on the type and quantity of products ordered.
Q6: What are your terms of payment?
A: We require 30% T/T in advance, with the balance due before shipment.