Basic Info.
Model NO. |
AY86,AY106,AY126, |
Material |
Steel Wood |
Type |
Pier pillar formwork |
Specification |
Q235B |
Panel thickness |
6mm |
Width |
500-6000mm |
Maxmum lateral pressure |
80 kn/square meter |
Height |
2000mm |
Guardrail height |
1200mm |
Appliation scope |
Roads,Railways,Water conservancy |
Number of Platform |
2m/layer |
Width of Operating Platform |
900mm |
Transport Package |
Package Box, Steel Pallet, Steel Frame, Container |
Brand |
Aoyu |
Origin |
China |
Production Capacity |
14000square meter/Month |
Product Description
Steel Formwork System
Our Steel Formwork System stands as a paragon of strength and durability, designed for multiple reuses in diverse construction projects. Its easy assembly and erection make it a preferred choice for projects requiring a consistent structural shape, such as high-rise buildings, roads, and bridges.
Packaging:
1. Typically, the container's net weight ranges from 22 to 25 tons, requiring confirmation before loading.
2. We offer various packaging options tailored to our products:
---Bundles: Suitable for timber beams, steel props, tie rods, etc.
---Pallet: Small parts are bagged and palletized for easy handling.
---Wooden cases: Available upon customer request for added protection.
---Bulk: Irregularly shaped items are loaded in bulk within the container.
Delivery:
1. Production: For a full container load, production typically takes 20-30 days post down payment confirmation.
2. Transportation: Timeframes vary depending on the destination port.
3. Special requirements may necessitate further negotiation.
FAQ
Q1: Are you a trading company or a manufacturer?
A: We are a professional stencil manufacturing company with two dedicated factories.
Q2: What services do you offer?
A: We specialize in designing and manufacturing formwork products for
bridges and tunnels.
Q3: How can you support our projects?
A: We provide expert suggestions, formwork layout drawings, and detailed quotations to project owners, design institutes, and contractors.
B: We sell our high-quality products to contractors, building companies, material suppliers, and trading firms.
C: We offer our superior formwork products to peer companies globally.
Q4: How long does it take to provide a basic design and quotation after receiving the structural drawing?
A: Typically, it takes
3
~7 days, depending on the specific project requirements.
Q5: How long does it take to manufacture the products after finalizing the contract?
A: Generally, production takes 30~60 days, contingent on the product type and quantity.
Q6: What are your payment terms?
A: We require 30% T/T in advance, with the remaining balance due before shipment.