Basic Info.
Model NO. |
AY86,AY106,AY126, |
Material |
Steel Wood |
Type |
Pier pillar formwork |
Specification |
Q235B |
Panel thickness |
6mm |
Width |
500-6000mm |
Maxmum lateral pressure |
80 kn/square meter |
Height |
2000mm |
Guardrail height |
1200mm |
Appliation scope |
Roads,Railways,Water conservancy |
Number of Platform |
2m/layer |
Width of Operating Platform |
900mm |
Transport Package |
Package Box, Steel Pallet, Steel Frame, Container |
Brand |
Aoyu |
Origin |
China |
Production Capacity |
14000square meter/Month |
Product Description
Steel Formwork System
Our Steel Formwork System is renowned for its exceptional durability and strength, making it a highly reusable solution in construction projects. The ease of assembly and erection ensures efficiency on-site. Its fixed shape and structure are ideal for large-scale applications requiring uniform structures, such as high-rise buildings, roads, and bridges.
Packaging:
1. The total net weight of a loaded container generally ranges from 22 to 25 tons, which needs confirmation before loading.
2. We use different packaging methods for various products:
---Bundles: Suitable for items like timber beams, steel props, and tie rods.
---Pallet: Small parts are packed in bags and placed on pallets for secure transport.
---Wooden cases: Available upon customer's request for added protection.
---Bulk: Irregular goods are loaded in bulk within the container.
Delivery:
1. Production: For full container orders, we typically require 20-30 days after receiving the customer's down payment.
2. Transportation: Delivery time depends on the destination port.
3. Special requirements necessitate further negotiation.
FAQ
Q1: Are you a trading company or manufacturer?
A: We are a professional stencil manufacturing company with two dedicated factories.
Q2: What is your area of expertise?
A: We specialize in designing and manufacturing formwork products used in
bridges and tunnels.
Q3: How can you assist us?
A: We provide expert suggestions, detailed formwork layout drawings, and competitive quotations to construction project owners, design institutes, and contractors.
B: We supply our high-quality products to contractors, building companies, material suppliers, and trading enterprises.
C: We also support our global peers by offering our top-tier formwork products.
Q4: How long does it take to prepare a brief design and quotation after receiving the structural drawings?
A: Typically, it takes
3
~7 days, depending on the project's specific requirements.
Q5: How long does it take to manufacture the products after signing the contract?
A: Generally, it takes 30-60 days, depending on the type and quantity of products required.
Q6: What are your terms of payment?
A: We require a 30% T/T advance payment, with the balance due before shipment.