Basic Info.
Model NO. |
AY86,AY106,AY126, |
Material |
Steel Wood |
Type |
Pier pillar formwork |
Specification |
Q235B |
Panel thickness |
6mm |
Width |
500-6000mm |
Maxmum lateral pressure |
80 kn/square meter |
Height |
2000mm |
Guardrail height |
1200mm |
Appliation scope |
Roads,Railways,Water conservancy |
Number of Platform |
2m/layer |
Width of Operating Platform |
900mm |
Transport Package |
Package Box, Steel Pallet, Steel Frame, Container |
Brand |
Aoyu |
Origin |
China |
Production Capacity |
14000square meter/Month |
Product Description
Steel Formwork System
Our Steel Formwork System is renowned for its strength and durability, enabling it to be reused multiple times across diverse construction projects. Ease of assembly and erection ensures efficiency. Its fixed shape and structure make it ideal for high-quantity, same-shaped structures, including high-rise buildings, roads, and bridges.
Packaging:
1. The net weight of a fully-loaded container typically ranges between 22 to 25 tons. This needs verification prior to loading.
2. Various products require distinct packaging solutions:
---Bundles: Suitable for timber beams, steel props, tie rods, etc.
---Pallet: Smaller parts are bagged and then placed on pallets.
---Wooden cases: Available upon customer request.
---Bulk: Irregularly shaped goods are loaded in bulk within the container.
Delivery:
1. Production: For a full container load, we typically require 20-30 days following receipt of the customer's down payment.
2. Transportation: The timeframe is contingent on the destination port.
3. Special requirements necessitate further negotiation.
FAQ
Q1: Are you a trading company or a manufacturer?
A: We are a professional stencil-making company with two proprietary factories.
Q2: What do you do?
A: We specialize in the design and manufacture of formwork products utilized in
bridge and tunnel construction.
Q3: What services can you provide for us?
A: We offer recommendations, detailed drawings for formwork layout, and competitive quotations to project owners, design institutes, and contractors.
B: We supply our products to contractors, building companies, material suppliers, and trading companies.
C: We provide our esteemed formwork products to peer companies globally.
Q4: How long does it take to prepare a preliminary design and quotation after receiving the structural drawing?
A: Typically, it takes
3
~7 days, contingent on the specific requirements of the construction project.
Q5: How long does it take to manufacture the products after contract signing?
A: Generally, the manufacturing process takes 30~60 days, depending on the type and quantity of products ordered.
Q6: What are your terms of payment?
A: A 30% T/T deposit is required in advance, with the remaining balance due before shipment.