Basic Info.
Model NO. |
AY86,AY106,AY126, |
Material |
Steel Wood |
Type |
Pier pillar formwork |
Specification |
Q235B |
Panel thickness |
6mm |
Width |
500-6000mm |
Maxmum lateral pressure |
80 kn/square meter |
Height |
2000mm |
Guardrail height |
1200mm |
Appliation scope |
Roads,Railways,Water conservancy |
Number of Platform |
2m/layer |
Width of Operating Platform |
900mm |
Transport Package |
Package Box, Steel Pallet, Steel Frame, Container |
Brand |
Aoyu |
Origin |
China |
Production Capacity |
14000square meter/Month |
Product Description
Steel Formwork System
Crafted for strength and endurance, our steel formwork offers exceptional durability and can be reused multiple times in construction projects. Its easy assembly and erection make it ideal for structures requiring repetitive shapes, such as high-rise buildings, roads, and bridges.
Packaging:
1. Generally, the total net weight of a loaded container ranges from 22 to 25 tons. This needs to be confirmed prior to loading.
2. We utilize various packaging methods tailored to different products:
---Bundles: For items such as timber beams, steel props, and tie rods.
---Pallets: Small parts are bagged and then placed on pallets.
---Wooden Cases: Available upon the customer's request.
---Bulk: Irregular goods are loaded in bulk within the container.
Delivery:
1. Production Timing: For a full container, we typically require 20-30 days after receiving the customer's down payment.
2. Transportation: The duration depends on the destination port.
3. Special requirements require negotiation.
FAQ
Q1: Are you a trading company or a manufacturer?
A: We are a professional stencil-making company with our own two factories.
Q2: What is your area of expertise?
A: We specialize in designing and manufacturing formwork products utilized in
bridges and tunnels.
Q3: How can you assist us?
A: We provide expert suggestions, detailed formwork layout drawings, and competitive quotations to the owners, design institutes, or contractors of construction projects.
B: We market our products to contractors, building companies, material suppliers, and trading companies.
C: We support our global peers with our superior formwork products.
Q4: How long does it take to provide a preliminary design and quotation after we supply the structural drawing?
A: Typically, it takes
3
~7 days, depending on the specific requirements of the construction project.
Q5: How long does it take to manufacture the products after the contract is signed?
A: Generally, it takes 30~60 days, depending on the type and quantity of products to be produced.
Q6: What are your payment terms?
A: 30% T/T in advance, with the balance due before shipment.