Basic Information
Model NO. |
AY86,AY106,AY126, |
Material |
Steel Wood |
Type |
Pier pillar formwork |
Specification |
Q235B |
Panel thickness |
6mm |
Width |
500-6000mm |
Maxmum lateral pressure |
80 kn/square meter |
Height |
2000mm |
Guardrail height |
1200mm |
Appliation scope |
Roads,Railways,Water conservancy |
Number of Platform |
2m/layer |
Width of Operating Platform |
900mm |
Transport Package |
Package Box, Steel Pallet, Steel Frame, Container |
Brand |
Aoyu |
Origin |
China |
Production Capacity |
14000square meter/Month |
Product Description
Steel Formwork System
Steel formwork is renowned for its strength and durability, allowing it to be reused multiple times in various construction projects. Its ease of assembly and erection, along with its fixed shape and structure, make it ideal for projects requiring a high volume of uniformly shaped structures such as high-rise buildings, roads, and bridges.
Packaging:
1. Typically, the total net weight of a loaded container ranges from 22 to 25 tons. This must be confirmed prior to loading.
2. Various packaging options are utilized for different products:
---Bundles: Suitable for timber beams, steel props, tie rods, etc.
---Pallet: Smaller parts are placed in bags and then arranged on pallets.
---Wooden Cases: Available upon customer request.
---Bulk: Irregularly shaped goods are loaded in bulk within the container.
Delivery:
1. Production: For a full container load, typically 20-30 days are required after receiving the customer's down payment.
2. Transportation: Duration depends on the destination port.
3. Special requirements will be negotiated accordingly.
Frequently Asked Questions (FAQ)
Q1: Are you a trading company or a manufacturer?
A: We are a professional stencil manufacturing company with our own two factories.
Q2: What services do you offer?
A: We specialize in designing and manufacturing formwork products used for
bridges and tunnels.
Q3: What can you provide for our project?
A: We provide our expertise, formwork layout drawings, and quotations to construction project owners, design institutes, or contractors.
B: We sell our products to contractors, construction companies, material suppliers, and trading companies.
C: We support our global peers with our exceptional formwork products.
Q4: How long does it take to prepare a preliminary design and quotation after receiving the structural drawing?
A: Typically, it takes
3
~7 days depending on the specific requirements of the construction project.
Q5: How long does it take to manufacture the products after the contract is signed?
A: Generally, it takes 30~60 days depending on the type and quantity of products required.
Q6: What are your payment terms?
A: 30% T/T in advance, with the balance due before shipment.