Steel Formwork System for Viaduct Construction

Product Details
Customization: Available
After-sales Service: Yes
Warranty: One Year
Diamond Member Since 2024

Suppliers with verified business licenses

Audited Supplier

Audited by an independent third-party inspection agency

High Repeat Buyers Choice
More than 50% of buyers repeatedly choose the supplier
Cooperated with Fortune 500
This supplier has Cooperated with Fortune 500 companies
Patents Awarded
The supplier had awarded 3 patents, you can check the Audit Report for more information
Management Certification
The supplier has quality management system certification, including:
ISO9001:2015 certificate
ISO14001
ISO45001:2018 certificate
to see all verified strength labels (19)
  • Steel Formwork System for Viaduct Construction
  • Steel Formwork System for Viaduct Construction
  • Steel Formwork System for Viaduct Construction
  • Steel Formwork System for Viaduct Construction
  • Steel Formwork System for Viaduct Construction
  • Steel Formwork System for Viaduct Construction
Find Similar Products

Basic Info.

Model NO.
Column template
Material
Steel
Type
Column Formwork
ODM or OEM
Yes
Size
Customized
Thickness
Customized
Transport Package
Container
Origin
Aoyu
HS Code
7308900000
Production Capacity
160000square Meters/Year

Product Description

Basic Info.
Model NO. AY86,AY106,AY126, Material Steel Wood
Type Pier pillar formwork Specification Q235B
Panel thickness 6mm Width 500-6000mm
Maxmum lateral pressure 80 kn/square meter Height 2000mm
Guardrail height 1200mm Appliation scope Roads,Railways,Water conservancy
Number of Platform 2m/layer Width of Operating Platform 900mm
Transport Package Package Box, Steel Pallet, Steel Frame, Container Brand Aoyu
Origin China Production Capacity 14000square meter/Month
 

Product Description

Steel Formwork System

The Steel Formwork System from Beijing Aoyu Template Co., Ltd. is exceptionally strong and durable, ensuring it can be reused multiple times throughout various construction projects. This system is designed for effortless assembly and erection. With its fixed shape and structure, it is the ideal solution for projects requiring a significant quantity of identically-shaped structures, such as high-rise buildings, roads, and bridges.
Steel Formwork System for Viaduct Construction
Steel Formwork System for Viaduct Construction
Steel Formwork System for Viaduct Construction
Steel Formwork System for Viaduct Construction
 

Packaging:

1. Typically, the total net weight of a loaded container ranges from 22 tons to 25 tons, a detail to be confirmed prior to loading.
2. Different packaging methods are applied depending on the nature of the product:
---Bundles: Used for timber beams, steel props, tie rods, etc.
---Pallets: Small parts are placed in bags, which are then set on pallets.
---Wooden Cases: Available upon customer request.
---Bulk: Irregularly shaped goods are loaded in bulk within the container.
Delivery:
1. Production: For a full container, the standard production period ranges from 20-30 days after receipt of the customer's down payment.
2. Transportation: The duration varies depending on the destination port.
3. Special requirements necessitate further negotiation.

FAQ
Q1: Are you a trading company or manufacturer?
A: We are a professional stencil manufacturing company with two proprietary factories.

Q2: What is your main business focus?
A: We specialize in designing and manufacturing formwork products utilized inbridge and tunnel construction.

Q3: How can you assist us?
A: We provide expert recommendations, formwork layout drawings, and competitive quotations to project owners, design institutes, and contractors.
B: We sell our high-quality products to contractors, construction companies, material suppliers, and trading firms.
C: We offer robust support to our global peer companies with superior formwork products.

Q4: How long does it take to create a preliminary design and quotation after we submit the structural drawing?
A: Generally, it takes3
~7 days, depending on the specific requirements of the construction project.

Q5: What is the timeline for manufacturing the products once the contract is signed?
A: Typically, it takes 30~60 days, contingent upon the type and volume of the products required.

Q6: What are your payment terms?
A: We require a 30% T/T advance payment, with the balance due before shipment.

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now
Contact Supplier