Basic Info.
Model NO. |
AY86,AY106,AY126, |
Material |
Steel Wood |
Type |
Pier pillar formwork |
Specification |
Q235B |
Panel thickness |
6mm |
Width |
500-6000mm |
Maxmum lateral pressure |
80 kn/square meter |
Height |
2000mm |
Guardrail height |
1200mm |
Appliation scope |
Roads,Railways,Water conservancy |
Number of Platform |
2m/layer |
Width of Operating Platform |
900mm |
Transport Package |
Package Box, Steel Pallet, Steel Frame, Container |
Brand |
Aoyu |
Origin |
China |
Production Capacity |
14000square meter/Month |
Product Description
Steel Formwork System
Steel formwork is heralded for its strength and durability, allowing it to be reused multiple times throughout various construction projects. Its assembly and erection are straightforward, thanks to its fixed shape and structure. This makes it exceptionally suitable for constructions requiring a significant number of identically shaped structures, such as high-rise buildings, roads, and bridges.
Packaging:
1. Typically, the total net weight of a loaded container ranges from 22 to 25 tons. This needs to be confirmed prior to loading.
2. Different packaging methods are employed for various products:
---Bundles: Includes timber beams, steel props, tie rods, and more.
---Pallet: Smaller parts are placed in bags before being set on pallets.
---Wooden cases: Available upon customer request.
---Bulk: Certain irregularly shaped goods are loaded in bulk within the container.
Delivery:
1. Production: For a full container, we typically require 20-30 days after receiving the customer's down payment.
2. Transportation: The timeline is dependent on the destination port charges.
3. Special requirements are subject to negotiation.
FAQ
Q1: Are you a trading company or a manufacturer?
A: We are a professional stencil-making company with two factories of our own.
Q2: What do you do?
A: We specialize in the design and manufacture of formwork products used for
bridges and tunnels.
Q3: What can you do for us?
A: We provide suggestions, formwork layout drawings, and quotations to owners, design institutes, or contractors of construction projects.
B: We sell our products to contractors, building companies, material suppliers, or trading companies.
C: We support our global peers with our exceptional formwork products.
Q4: How long does it take to create a brief design and quotation after we provide the structural drawing?
A: Generally, it takes
3
~7 days, depending on the specific requirements of the construction project.
Q5: How long does it take to manufacture the products after the contract is signed?
A: Typically, it takes between 30 and 60 days, based on the type and quantity of the products to be produced.
Q6: What are your terms of payment?
A: 30% T/T in advance, with the balance due before shipment.