Building Formwork System for Construction Projects

Product Details
Customization: Available
After-sales Service: Yes
Warranty: One Year
Diamond Member Since 2024

Suppliers with verified business licenses

Audited Supplier

Audited by an independent third-party inspection agency

High Repeat Buyers Choice
More than 50% of buyers repeatedly choose the supplier
Cooperated with Fortune 500
This supplier has Cooperated with Fortune 500 companies
Patents Awarded
The supplier had awarded 3 patents, you can check the Audit Report for more information
Management Certification
The supplier has quality management system certification, including:
ISO9001:2015 certificate
ISO14001
ISO45001:2018 certificate
to see all verified strength labels (19)
  • Building Formwork System for Construction Projects
  • Building Formwork System for Construction Projects
  • Building Formwork System for Construction Projects
  • Building Formwork System for Construction Projects
  • Building Formwork System for Construction Projects
  • Building Formwork System for Construction Projects
Find Similar Products

Basic Info.

Model NO.
Column template
Certification
ISO
Material
Steel
Type
Column Formwork
ODM or OEM
Yes
Size
Customized
Thickness
Customized
Transport Package
Container
Origin
Aoyu
HS Code
7308900000
Production Capacity
160000square Meters/Year

Product Description

Basic Info.
Model NO. AY86,AY106,AY126, Material Steel Wood
Type Pier pillar formwork Specification Q235B
Panel thickness 6mm Width 500-6000mm
Maxmum lateral pressure 80 kn/square meter Height 2000mm
Guardrail height 1200mm Appliation scope Roads,Railways,Water conservancy
Number of Platform 2m/layer Width of Operating Platform 900mm
Transport Package Package Box, Steel Pallet, Steel Frame, Container Brand Aoyu
Origin China Production Capacity 14000square meter/Month
 

Product Description

Steel Formwork System

Our Steel Formwork System is renowned for its strength and durability, making it an ideal choice for repeated use across numerous construction projects. The system is easy to assemble and erect, thanks to its fixed shape and structure. This high adaptability makes it perfect for large-scale constructions requiring uniform structural elements, such as high-rise buildings, roads, and bridges.
Building Formwork System for Construction Projects
Building Formwork System for Construction Projects
Building Formwork System for Construction Projects
Building Formwork System for Construction Projects
 

Packaging:

1. Generally, the total net weight of a loaded container ranges from 22 tons to 25 tons, which needs to be confirmed prior to loading.
2. Tailored packaging solutions for different products:
---Bundles: Ideal for timber beams, steel props, tie rods, etc.
---Pallet: Small parts are securely placed in bags and then on pallets.
---Wooden cases: Available upon customer request for enhanced safety.
---Bulk: Some irregularly shaped goods are loaded in bulk within the container.
Delivery:
1. Production: For a full container load, we typically require 20-30 days following the receipt of the customer's down payment.
2. Transportation: Delivery timelines depend on the destination charge port.
3. Negotiations are required for any special delivery requirements.

FAQ
Q1: Are you a trading company or manufacturer?
A: We are a professional stencil-making company with two dedicated factories.

Q2: What do you specialize in?
A: We design and manufacture high-quality formwork products utilized inthe construction of bridges and tunnels.

Q3: What services do you offer?
A: We provide expert suggestions, detailed formwork layout drawings, and competitive quotations to project owners, design institutes, and contractors.
B: We sell our top-notch products to contractors, building companies, material suppliers, and trading companies.
C: We proudly support our global peer companies with our superior formwork solutions.

Q4: How long does it take to prepare a preliminary design and quotation after receiving the structural drawing?
A: Generally, it takes3
~7 days depending on the specific requirements of the construction project.

Q5: How long does it take to manufacture the products after signing the contract?
A: Typically, it takes 30~60 days based on the nature and volume of the products to be produced.

Q6: What are your payment terms?
A: We require a 30% T/T advance payment, with the remaining balance due before shipment.

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now
Contact Supplier