Basic Info.
Model NO. |
AY86,AY106,AY126, |
Material |
Steel Wood |
Type |
Pier pillar formwork |
Specification |
Q235B |
Panel thickness |
6mm |
Width |
500-6000mm |
Maxmum lateral pressure |
80 kn/square meter |
Height |
2000mm |
Guardrail height |
1200mm |
Appliation scope |
Roads,Railways,Water conservancy |
Number of Platform |
2m/layer |
Width of Operating Platform |
900mm |
Transport Package |
Package Box, Steel Pallet, Steel Frame, Container |
Brand |
Aoyu |
Origin |
China |
Production Capacity |
14000square meter/Month |
Product Description
Steel Formwork System
Our Steel Formwork System is renowned for its strength and durability, making it an ideal choice for repeated use across numerous construction projects. The system is easy to assemble and erect, thanks to its fixed shape and structure. This high adaptability makes it perfect for large-scale constructions requiring uniform structural elements, such as high-rise buildings, roads, and bridges.
Packaging:
1. Generally, the total net weight of a loaded container ranges from 22 tons to 25 tons, which needs to be confirmed prior to loading.
2. Tailored packaging solutions for different products:
---Bundles: Ideal for timber beams, steel props, tie rods, etc.
---Pallet: Small parts are securely placed in bags and then on pallets.
---Wooden cases: Available upon customer request for enhanced safety.
---Bulk: Some irregularly shaped goods are loaded in bulk within the container.
Delivery:
1. Production: For a full container load, we typically require 20-30 days following the receipt of the customer's down payment.
2. Transportation: Delivery timelines depend on the destination charge port.
3. Negotiations are required for any special delivery requirements.
FAQ
Q1: Are you a trading company or manufacturer?
A: We are a professional stencil-making company with two dedicated factories.
Q2: What do you specialize in?
A: We design and manufacture high-quality formwork products utilized in
the construction of bridges and tunnels.
Q3: What services do you offer?
A: We provide expert suggestions, detailed formwork layout drawings, and competitive quotations to project owners, design institutes, and contractors.
B: We sell our top-notch products to contractors, building companies, material suppliers, and trading companies.
C: We proudly support our global peer companies with our superior formwork solutions.
Q4: How long does it take to prepare a preliminary design and quotation after receiving the structural drawing?
A: Generally, it takes
3
~7 days depending on the specific requirements of the construction project.
Q5: How long does it take to manufacture the products after signing the contract?
A: Typically, it takes 30~60 days based on the nature and volume of the products to be produced.
Q6: What are your payment terms?
A: We require a 30% T/T advance payment, with the remaining balance due before shipment.