Basic Info.
Model NO. |
AY86,AY106,AY126, |
Material |
Steel Wood |
Type |
Pier pillar formwork |
Specification |
Q235B |
Panel thickness |
6mm |
Width |
500-6000mm |
Maxmum lateral pressure |
80 kn/square meter |
Height |
2000mm |
Guardrail height |
1200mm |
Appliation scope |
Roads,Railways,Water conservancy |
Number of Platform |
2m/layer |
Width of Operating Platform |
900mm |
Transport Package |
Package Box, Steel Pallet, Steel Frame, Container |
Brand |
Aoyu |
Origin |
China |
Production Capacity |
14000square meter/Month |
Product Description
Steel Formwork System
Steel formwork stands out for its impressive strength and durability, making it a cornerstone in construction projects. Its reusable nature adds economic value, while its easy assembly and erection streamline project timelines. Featuring a fixed shape and structure, it is ideal for projects requiring numerous identical structures, such as high-rise buildings, roads, and bridges.
Packaging:
1. Typically, the net weight of a loaded container ranges from 22 to 25 tons, which must be confirmed prior to loading.
2. We utilize different packaging methods tailored to specific products:
---Bundles: Used for items like timber beams, steel props, and tie rods.
---Pallet: Smaller parts are bagged and then placed on pallets.
---Wooden cases: Available upon customer request for added protection.
---Bulk: Irregularly shaped goods are loaded in bulk within the container.
Delivery:
1. Production: For a full container load, production typically requires 20-30 days after receiving the customer's down payment.
2. Transportation: Duration varies depending on the destination port.
3. Special requirements necessitate further negotiation.
FAQ
Q1: Are you a trading company or manufacturer?
A: We are a professional stencil making company with two factories.
Q2: What do you do?
A: We specialize in designing and manufacturing formwork products used for
bridges and tunnels.
Q3: What can you do for us?
A: We provide expert suggestions, detailed formwork layout drawings, and competitive quotations to construction project stakeholders, including owners, design institutes, and contractors.
B: We supply our products to contractors, construction companies, material suppliers, and trading firms.
C: We support our global peers with our premium formwork products.
Q4: How long does it take to create a brief design and quotation after receiving the structural drawing?
A: Generally, it takes
3
~7 days based on the specific requirements of the construction project.
Q5: How long does it take to manufacture the products after signing the contract?
A: Typically, it takes 30~60 days, depending on the type and quantity of products.
Q6: What are your terms of payment?
A: 30% T/T in advance, with the balance due before shipment.