Basic Info.
Model NO. |
AY86,AY106,AY126, |
Material |
Steel Wood |
Type |
Pier pillar formwork |
Specification |
Q235B |
Panel thickness |
6mm |
Width |
500-6000mm |
Maxmum lateral pressure |
80 kn/square meter |
Height |
2000mm |
Guardrail height |
1200mm |
Appliation scope |
Roads,Railways,Water conservancy |
Number of Platform |
2m/layer |
Width of Operating Platform |
900mm |
Transport Package |
Package Box, Steel Pallet, Steel Frame, Container |
Brand |
Aoyu |
Origin |
China |
Production Capacity |
14000square meter/Month |
Product Description
Steel Formwork System
Our Steel Formwork System is a marvel of strength and durability, designed for repeated use in construction projects. Its simplicity in assembly and erection makes it an ideal choice for projects requiring uniform structures, such as high-rise buildings, roads, and bridges.
Packaging:
1. Generally, the total net weight of a loaded container ranges from 22 tons to 25 tons. This needs to be confirmed prior to loading.
2. We use various packaging methods tailored to different products:
---Bundles: Ideal for timber beams, steel props, tie rods, etc.
---Pallet: Small parts are bagged and placed on pallets for secure transportation.
---Wooden Cases: Available upon customer's request for added protection.
---Bulk: Suitable for loading irregular goods directly into the container.
Delivery:
1. Production: For a full container load, we typically require 20-30 days post receipt of the customer's down payment.
2. Transportation: Duration varies depending on the destination charge port.
3. Special requirements may necessitate further negotiation.
FAQ
Q1: Are you a trading company or manufacturer?
A: We are a professional stencil manufacturing company, boasting two fully operational factories.
Q2: What services do you provide?
A: We specialize in the design and manufacture of formwork products utilized in
bridges and tunnels.
Q3: What can you offer us?
A: We provide expert suggestions, detailed formwork layout drawings, and competitive quotations to construction project owners, design institutes, and contractors.
B: We sell our high-quality products to contractors, construction companies, material suppliers, and trading companies.
C: We also support our global peers with our exceptional formwork products.
Q4: How long does it take to prepare a brief design and quotation after receiving the structural drawing?
A: Generally, it takes
3
~7 days, depending on the specific project requirements.
Q5: How long does it take to manufacture the products after the contract is signed?
A: Typically, it takes 30~60 days, depending on the type and quantity of products ordered.
Q6: What are your payment terms?
A: 30% T/T in advance, with the balance due before shipment.