Basic Info.
Model NO. |
AY86,AY106,AY126, |
Material |
Steel Wood |
Type |
Pier pillar formwork |
Specification |
Q235B |
Panel thickness |
6mm |
Width |
500-6000mm |
Maxmum lateral pressure |
80 kn/square meter |
Height |
2000mm |
Guardrail height |
1200mm |
Appliation scope |
Roads,Railways,Water conservancy |
Number of Platform |
2m/layer |
Width of Operating Platform |
900mm |
Transport Package |
Package Box, Steel Pallet, Steel Frame, Container |
Brand |
Aoyu |
Origin |
China |
Production Capacity |
14000square meter/Month |
Product Description
Steel Formwork System
Our Steel Formwork System is a testament to strength and durability, making it an ideal choice for repeated use in construction projects. The assembly and erection process is straightforward, and its fixed shape is perfect for projects requiring numerous identical structures, such as high-rise buildings, roads, and bridges.
Packaging:
1. Typically, the total net weight of a loaded container ranges from 22 tons to 25 tons. This must be confirmed before loading.
2. We use various packaging methods tailored to different products:
---Bundles: Suitable for timber beams, steel props, tie rods, etc.
---Pallets: Smaller parts are placed in bags, then securely arranged on pallets.
---Wooden Cases: Available upon customer request for added protection.
---Bulk: Irregularly shaped goods are loaded in bulk within the container.
Delivery:
1. Production: For a full container load, we typically require 20-30 days post-receipt of the customer's down payment.
2. Transportation: The delivery timeline varies based on the destination port.
3. Special requirements may necessitate further negotiation.
FAQ
Q1: Are you a trading company or a manufacturer?
A: We are a professional stencil-making company, boasting two of our own factories.
Q2: What do you specialize in?
A: We specialize in designing and manufacturing formwork products used for
bridges and tunnels.
Q3: How can you assist us?
A: We offer expert suggestions, detailed drawings of formwork layouts, and competitive quotations for construction project owners, design institutes, or contractors.
B: We sell our products directly to contractors, building companies, material suppliers, or trading firms.
C: We support our global peers with exceptional formwork products.
Q4: How long does it take to prepare a brief design and quotation after we provide the structural drawing?
A: Typically, it takes
3
~7 days, depending on the specific requirements of the construction project.
Q5: How long does it take to manufacture the products after the contract is signed?
A: On average, it takes 30~60 days, depending on the type and quantity of the products being produced.
Q6: What are your terms of payment?
A: We require a 30% T/T in advance, with the balance due before shipment.