Basic Info.
Model NO. |
AY86,AY106,AY126, |
Material |
Steel Wood |
Type |
Pier pillar formwork |
Specification |
Q235B |
Panel thickness |
6mm |
Width |
500-6000mm |
Maxmum lateral pressure |
80 kn/square meter |
Height |
2000mm |
Guardrail height |
1200mm |
Appliation scope |
Roads,Railways,Water conservancy |
Number of Platform |
2m/layer |
Width of Operating Platform |
900mm |
Transport Package |
Package Box, Steel Pallet, Steel Frame, Container |
Brand |
Aoyu |
Origin |
China |
Production Capacity |
14000square meter/Month |
Product Description
Steel Formwork System
Our steel formwork is the epitome of strength and durability, ensuring it can be reused countless times across various construction projects. It boasts easy assembly and erection, with a fixed shape and structure that makes it ideal for projects requiring uniform, repeated shapes, such as high-rise buildings, roads, and bridges.
Packaging:
1. Typically, the total net weight of a loaded container ranges between 22 to 25 tons, requiring confirmation prior to loading.
2. We use tailored packaging solutions for different products:
---Bundles: Ideal for timber beams, steel props, tie rods, etc.
---Pallet: Small parts are bagged first and then placed on pallets.
---Wooden Cases: Available upon customer request.
---Bulk: Irregular goods are loaded in bulk within the container.
Delivery:
1. Production: For a full container, we generally require 20-30 days post receipt of the customer's down payment.
2. Transportation: Dependable on the destination charge port.
3. Special requirements necessitate negotiation.
FAQ
Q1: Are you a trading company or a manufacturer?
A: We are a professional stencil manufacturing company with two dedicated factories.
Q2: What do you do?
A: We specialize in designing and manufacturing formwork products tailored for
bridge and tunnel construction.
Q3: What can you do for us?
A: We provide expert suggestions, detailed formwork layout drawings, and competitive quotations for construction project owners, design institutes, and contractors.
B: We sell our high-quality products to contractors, building companies, material suppliers, and trading firms.
C: We support our global peers with our exceptional formwork products.
Q4: How long does it take to produce a brief design and quotation after we provide the structural drawing?
A: Typically, it takes
3
~7 days, depending on the specific project requirements.
Q5: How long does it take to manufacture the products after the contract has been signed?
A: Generally, it takes 30~60 days, depending on the type and quantity of the products required.
Q6: What are your terms of payment?
A: 30% T/T in advance, with the balance due before shipment.