Basic Info.
Model NO. |
AY86,AY106,AY126, |
Material |
Steel Wood |
Type |
Pier pillar formwork |
Specification |
Q235B |
Panel thickness |
6mm |
Width |
500-6000mm |
Maxmum lateral pressure |
80 kn/square meter |
Height |
2000mm |
Guardrail height |
1200mm |
Appliation scope |
Roads,Railways,Water conservancy |
Number of Platform |
2m/layer |
Width of Operating Platform |
900mm |
Transport Package |
Package Box, Steel Pallet, Steel Frame, Container |
Brand |
Aoyu |
Origin |
China |
Production Capacity |
14000square meter/Month |
Product Description
Steel Formwork System
Our Steel Formwork stands out for its exceptional strength and durability, making it an ideal choice for multiple reuse in various construction projects. Its user-friendly assembly and erection process ensure efficiency and precision. Perfectly suited for projects requiring numerous identically-shaped structures, such as high-rise buildings, roads, and bridges.
Packaging:
1. Typically, the net weight of a loaded container ranges between 22 to 25 tons. This must be confirmed prior to loading.
2. We employ different packaging methods tailored for various products:
---Bundles: Ideal for timber beams, steel props, tie rods, etc.
---Pallet: Small parts are securely packed in bags and placed on pallets.
---Wooden cases: Available upon customer's request for added protection.
---Bulk: Suitable for some irregularly shaped goods, which will be loaded in bulk within the container.
Delivery:
1. Production: For a full container, our standard lead time is 20-30 days after receiving the customer's down payment.
2. Transportation: Delivery time varies depending on the destination port.
3. Special requirements are to be discussed and negotiated to meet specific needs.
FAQ
Q1: Are you a trading company or manufacturer?
A: We are a professional stencil-making company with our own two factories.
Q2: What services do you offer?
A: We specialize in the design and manufacture of top-quality formwork products used in
bridges and tunnels.
Q3: How can you assist us?
A: We provide expert suggestions, detailed formwork layout drawings, and competitive quotations for owners, design institutes, or contractors of construction projects.
B: We sell our superior products to contractors, building companies, material suppliers, or trading entities.
C: We support our international peer companies by supplying exceptional formwork products.
Q4: How long does it take to prepare a brief design and quotation after receiving the structural drawing?
A: Generally, it takes
3
~7 days, depending on the specific requirements of the construction project.
Q5: How long does it take to manufacture the products after signing the contract?
A: Typically, production takes 30~60 days, depending on the type and quantity of products required.
Q6: What are your payment terms?
A: 30% T/T in advance, with the balance due before shipment.