Basic Info.
Model NO. |
AY86,AY106,AY126, |
Material |
Steel Wood |
Type |
Pier pillar formwork |
Specification |
Q235B |
Panel thickness |
6mm |
Width |
500-6000mm |
Maxmum lateral pressure |
80 kn/square meter |
Height |
2000mm |
Guardrail height |
1200mm |
Appliation scope |
Roads,Railways,Water conservancy |
Number of Platform |
2m/layer |
Width of Operating Platform |
900mm |
Transport Package |
Package Box, Steel Pallet, Steel Frame, Container |
Brand |
Aoyu |
Origin |
China |
Production Capacity |
14000square meter/Month |
Product Description
Steel Formwork System
The Steel Formwork System by Beijing Aoyu Template Co., Ltd. is renowned for its robustness and longevity, making it an unparalleled choice in construction. This system is not only easy to assemble and erect but is also perfectly suited for projects requiring multiple identical structures. Ideal applications include high-rise buildings, roads, bridges, and more, where strength and reusability are paramount.
Packaging:
1. The total net weight for a loaded container generally ranges from 22 to 25 tons. This needs to be confirmed prior to loading.
2. We use different packaging solutions tailored to various products:
---Bundles: Ideal for timber beams, steel props, tie rods, etc.
---Pallet: Small parts are bagged and then placed on pallets.
---Wooden cases: Available upon customer request for added protection.
---Bulk: Irregularly shaped goods are loaded in bulk within the container.
Delivery:
1. Production: For a full container, production typically takes 20-30 days from receipt of the customer's down payment.
2. Transportation: Duration depends on the destination port.
3. Special requirements: Negotiation is needed for any special requests.
FAQ
Q1: Are you a trading company or manufacturer?
A: We are a professional stencil making company with our own two factories.
Q2: What do you do?
A: We design and manufacture formwork products specifically for
bridges and tunnels.
Q3: What can you do for us?
A: We offer expert suggestions, detailed formwork layout drawings, and competitive quotations to project owners, design institutes, or contractors.
B: We sell our high-quality products to contractors, building companies, material suppliers, or trading companies.
C: We also support our global peers with our exceptional formwork products.
Q4: How long does it take to create a brief design and quotation after we provide the structural drawing?
A: Generally,
3
~7 days are needed, depending on the specific requirements of the construction project.
Q5: How long does it take to manufacture the products after signing the contract?
A: Typically, manufacturing takes 30~60 days, contingent on the type and quantity of the products ordered.
Q6: What are your terms of payment?
A: We require a 30% T/T advance payment, with the balance due before shipment.