Basic Info.
Model NO. |
AY86,AY106,AY126, |
Material |
Steel Wood |
Type |
Pier pillar formwork |
Specification |
Q235B |
Panel thickness |
6mm |
Width |
500-6000mm |
Maxmum lateral pressure |
80 kn/square meter |
Height |
2000mm |
Guardrail height |
1200mm |
Appliation scope |
Roads,Railways,Water conservancy |
Number of Platform |
2m/layer |
Width of Operating Platform |
900mm |
Transport Package |
Package Box, Steel Pallet, Steel Frame, Container |
Brand |
Aoyu |
Origin |
China |
Production Capacity |
14000square meter/Month |
Product Description
Steel Formwork System
Steel formwork is renowned for its strength and durability, making it reusable for numerous construction projects. Its design allows for easy assembly and erection. The fixed shape and structure of our steel formwork make it ideal for projects requiring large quantities of uniformly shaped structures, such as high-rise buildings, roads, and bridges.
Packaging:
1. Typically, the total net weight of a loaded container ranges from 22 to 25 tons, which needs confirmation before loading.
2. Various packaging methods are employed for different products:
---Bundles: Suitable for timber beams, steel props, tie rods, etc.
---Pallet: Smaller parts are placed in bags and then arranged on pallets.
---Wooden cases: Available upon customer's request.
---Bulk: Irregular goods are loaded in bulk within the container.
Delivery:
1. Production: For a full container, we generally require 20-30 days after receiving the customer's down payment.
2. Transportation: The duration depends on the destination port's charges.
3. Special requirements necessitate negotiation.
FAQ
Q1: Are you a trading company or manufacturer?
A: We are a professional stencil-making company with our own two factories.
Q2: What do you do?
A: We specialize in designing and manufacturing formwork products used in
bridges and tunnels.
Q3: What can you do for us?
A: We provide our suggestions, formwork layout drawings, and quotations to owners, design institutes, or construction project contractors.
B: We sell our products to contractors, building companies, material suppliers, or trading companies.
C: We support our global peer companies with our superior formwork products.
Q4: How long does it take to prepare a brief design and quotation after we provide the structural drawing?
A: Typically, it takes
3
~7 days based on the specific requirements of the construction project.
Q5: How long does it take to manufacture the products after the contract is signed?
A: Generally, it takes 30~60 days depending on the type and quantity of products to be produced.
Q6: What are your terms of payment?
A: A 30% T/T advance payment is required, with the balance due before shipment.