Basic Info.
Model NO. |
AY86,AY106,AY126, |
Material |
Steel Wood |
Type |
Pier pillar formwork |
Specification |
Q235B |
Panel thickness |
6mm |
Width |
500-6000mm |
Maxmum lateral pressure |
80 kn/square meter |
Height |
2000mm |
Guardrail height |
1200mm |
Appliation scope |
Roads,Railways,Water conservancy |
Number of Platform |
2m/layer |
Width of Operating Platform |
900mm |
Transport Package |
Package Box, Steel Pallet, Steel Frame, Container |
Brand |
Aoyu |
Origin |
China |
Production Capacity |
14000square meter/Month |
Product Description
Steel Formwork System
Our Steel Formwork is engineered for strength and durability, allowing for multiple reuses in construction projects. Its user-friendly assembly and erection processes make it ideal for high-rise buildings, roads, bridges, and any construction requiring uniform, repeated structures.
Packaging:
1. Typically, the total net weight of a loaded container ranges from 22 to 25 tons, which must be confirmed before loading.
2. We utilize various packaging methods tailored to different products:
---Bundles: Used for timber beams, steel props, tie rods, and similar items.
---Pallet: Small parts are bagged and then placed on pallets for secure transport.
---Wooden cases: Available upon customer's request for additional protection.
---Bulk: Irregularly shaped goods are loaded in bulk within the container.
Delivery:
1. Production: For full container loads, we typically require 20-30 days after receiving the customer's down payment to complete production.
2. Transportation: Delivery timelines depend on the destination port charges.
3. Special requirements can be discussed and negotiated.
FAQ
Q1: Are you a trading company or a manufacturer?
A: We are a professional stencil making company with two dedicated factories.
Q2: What do you specialize in?
A: We design and manufacture high-quality formwork products for
bridges and tunnels.
Q3: How can you assist us?
A: We provide expert suggestions, detailed formwork layout drawings, and competitive quotations for construction project stakeholders, including owners, design institutes, and contractors.
B: We supply our products to contractors, construction companies, material suppliers, and trading companies.
C: We support global peer companies with our exceptional formwork products.
Q4: How long does it take to prepare a preliminary design and quotation after receiving the structural drawing?
A: Generally, it takes
3
~7 days, depending on the specific requirements of the construction project.
Q5: How long does it take to manufacture the products after the contract is signed?
A: Typically, it takes 30~60 days, depending on the type and quantity of products to be produced.
Q6: What are your terms of payment?
A: We require a 30% T/T advance payment, with the balance due before shipment.