Basic Info.
Model NO. |
AY86,AY106,AY126, |
Material |
Steel Wood |
Type |
Pier pillar formwork |
Specification |
Q235B |
Panel thickness |
6mm |
Width |
500-6000mm |
Maxmum lateral pressure |
80 kn/square meter |
Height |
2000mm |
Guardrail height |
1200mm |
Appliation scope |
Roads,Railways,Water conservancy |
Number of Platform |
2m/layer |
Width of Operating Platform |
900mm |
Transport Package |
Package Box, Steel Pallet, Steel Frame, Container |
Brand |
Aoyu |
Origin |
China |
Production Capacity |
14000square meter/Month |
Product Description
Steel Formwork System
Our steel formwork system is renowned for its strength and durability, making it the ideal choice for repetitive use in construction projects. Easy to assemble and erect, it provides a fixed shape and structure, perfectly suited for large-scale projects requiring numerous identical structures, such as high-rise buildings, roads, and bridges.
Packaging:
1. Typically, the net weight of a loaded container ranges from 22 to 25 tons, which must be confirmed prior to loading.
2. Packaging varies by product:
---Bundles: For items like timber beams, steel props, and tie rods.
---Pallet: Small parts are bagged and then placed on pallets.
---Wooden Cases: Available upon customer's request.
---Bulk: Some irregular items are loaded in bulk within the container.
Delivery:
1. Production: For a full container, we typically require 20-30 days after receiving the customer's down payment.
2. Transportation: Duration depends on the destination port charges.
3. Special requirements can be discussed and negotiated.
FAQ
Q1: Are you a trading company or a manufacturer?
A: We are a professional stencil-making company with our own two factories.
Q2: What do you do?
A: We specialize in designing and manufacturing formwork products specifically for
bridges and tunnels.
Q3: What services do you offer?
A: We provide expert suggestions, detailed formwork layout drawings, and competitive quotations to project owners, design institutes, and contractors.
B: We supply our products to contractors, construction companies, material suppliers, and trading firms.
C: We collaborate with global peer companies, sharing our high-quality formwork products.
Q4: How long does it take to create a brief design and quote after receiving the structural drawing?
A: Typically, it takes
3
~7 days depending on the specific requirements of the construction project.
Q5: How long does it take to manufacture the products after the contract is signed?
A: Generally, it takes 30~60 days, depending on the type and quantity of products to be manufactured.
Q6: What are your payment terms?
A: 30% T/T in advance, with the balance due before shipment.