Basic Info.
Model NO. |
AY86,AY106,AY126, |
Material |
Steel Wood |
Type |
Pier pillar formwork |
Specification |
Q235B |
Panel thickness |
6mm |
Width |
500-6000mm |
Maxmum lateral pressure |
80 kn/square meter |
Height |
2000mm |
Guardrail height |
1200mm |
Appliation scope |
Roads,Railways,Water conservancy |
Number of Platform |
2m/layer |
Width of Operating Platform |
900mm |
Transport Package |
Package Box, Steel Pallet, Steel Frame, Container |
Brand |
Aoyu |
Origin |
China |
Production Capacity |
14000square meter/Month |
Product Description
Steel Formwork System
Our Steel Scaffold Formwork System is designed to be exceptionally strong and durable, making it ideal for repeated use in various construction projects. The system is easy to assemble and erect, offering a fixed shape and structure, which makes it perfect for projects requiring a large quantity of same-shaped structures, such as high-rise buildings, roads, and bridges.
Packaging:
1. Typically, the total net weight of a loaded container ranges from 22 tons to 25 tons. This needs to be verified before loading.
2. We use different packaging methods for various products:
---Bundles: For timber beams, steel props, tie rods, etc.
---Pallet: Small parts are packed in bags and then placed on pallets.
---Wooden cases: Available upon customer's request.
---Bulk: Irregular goods are loaded in bulk into containers.
Delivery:
1. Production: For a full container, we usually need 20-30 days after receiving the customer's down payment.
2. Transportation: The duration depends on the destination charge port.
3. Special requirements must be negotiated.
FAQ
Q1: Are you a trading company or manufacturer?
A: We are a professional stencil-making company with two of our own factories.
Q2: What do you do?
A: We specialize in designing and manufacturing formwork products used for
bridges and tunnels.
Q3: What can you do for us?
A: We provide expert suggestions, detailed formwork layout drawings, and quotations to owners, design institutes, or contractors of construction projects.
B: Our products are sold to contractors, building companies, material suppliers, or trading companies.
C: We support our global peers with our exceptional formwork products.
Q4: How long does it take to create a brief design and quotation after we provide the structural drawing?
A: It generally takes
3
~7 days depending on the specific requirements of the construction project.
Q5: How long does it take to manufacture the products after signing the contract?
A: Typically, it takes 30~60 days based on the type and quantity of products to be produced.
Q6: What are your terms of payment?
A: 30% T/T in advance, with the balance due before shipment.