Basic Info.
Model NO. |
AY86,AY106,AY126, |
Material |
Steel Wood |
Type |
Pier pillar formwork |
Specification |
Q235B |
Panel thickness |
6mm |
Width |
500-6000mm |
Maxmum lateral pressure |
80 kn/square meter |
Height |
2000mm |
Guardrail height |
1200mm |
Appliation scope |
Roads,Railways,Water conservancy |
Number of Platform |
2m/layer |
Width of Operating Platform |
900mm |
Transport Package |
Package Box, Steel Pallet, Steel Frame, Container |
Brand |
Aoyu |
Origin |
China |
Production Capacity |
14000square meter/Month |
Product Description
Steel Formwork System
Our Steel Formwork System is engineered for strength and durability, making it exceptionally reusable across numerous construction projects. Simple to assemble and erect, it features a fixed shape and structure, perfectly suited for high-volume applications involving identical structural designs, such as high-rise buildings, roads, and bridges.
Packaging:
1. Typically, the total net weight of a loaded container ranges between 22 to 25 tons. This must be confirmed before loading.
2. Different packages are tailored for various products:
---Bundles: Ideal for timber beams, steel props, tie rods, etc.
---Pallet: Small parts are placed in bags and then on pallets.
---Wooden cases: Available upon customer request, ensuring added protection.
---Bulk: Certain irregular goods are loaded in bulk within the container.
Delivery:
1. Production: For a full container order, it typically takes 20-30 days after receiving the customer's down payment.
2. Transportation: The duration depends on the destination port's charges.
3. Special requirements may necessitate further negotiation.
FAQ
Q1: Are you a trading company or a manufacturer?
A: We are a specialized stencil manufacturing company, boasting two dedicated factories.
Q2: What services do you offer?
A: We design and manufacture top-tier formwork products tailored for
bridges and tunnels.
Q3: What can you provide for our projects?
A: We deliver expert suggestions, detailed drawings of formwork layouts, and competitive quotations to project owners, design institutes, and contractors.
B: We supply our products to contractors, construction companies, material suppliers, and trading companies.
C: We support our global peers by offering them our premium formwork products.
Q4: How long does it take to create a preliminary design and quotation once we provide the structural drawing?
A: Generally, it takes
3
~7 days depending on the specific requirements of the construction project.
Q5: How long does it take to manufacture the products after signing the contract?
A: Typically, it takes 30-60 days, depending on the type and quantity of products ordered.
Q6: What are your payment terms?
A: We require a 30% T/T advance payment, with the balance due before shipment.