Basic Info.
Model NO. |
AY86,AY106,AY126, |
Material |
Steel Wood |
Type |
Pier pillar formwork |
Specification |
Q235B |
Panel thickness |
6mm |
Width |
500-6000mm |
Maxmum lateral pressure |
80 kn/square meter |
Height |
2000mm |
Guardrail height |
1200mm |
Appliation scope |
Roads,Railways,Water conservancy |
Number of Platform |
2m/layer |
Width of Operating Platform |
900mm |
Transport Package |
Package Box, Steel Pallet, Steel Frame, Container |
Brand |
Aoyu |
Origin |
China |
Production Capacity |
14000square meter/Month |
Product Description
Steel Formwork System
Our Steel Formwork System is engineered for strength and durability, offering exceptional reusability in construction projects. Its design ensures easy assembly and erection, making it ideal for projects requiring numerous identical structural elements, such as high-rise buildings, roads, and bridges.
Packaging:
1. Generally, the total net weight of a loaded container ranges from 22 to 25 tons, which needs confirmation prior to loading.
2. Specialized packaging is used for different products:
---Bundles: Suitable for timber beams, steel props, tie rods, etc.
---Pallet: Small parts are bagged and then placed on pallets.
---Wooden Cases: Available upon customer request.
---Bulk: Irregular goods are loaded in bulk within the container.
Delivery:
1. Production: For full container orders, we typically require 20-30 days after receiving the customer's down payment.
2. Transportation: Delivery times vary depending on the destination port.
3. Special requirements are subject to negotiation.
FAQ
Q1: Are you a trading company or a manufacturer?
A: We are a professional stencil-making company with two fully operational factories.
Q2: What services do you offer?
A: We specialize in the design and manufacture of formwork products used for
bridges and tunnels.
Q3: How can you assist us?
A: We provide expert suggestions, formwork layout drawings, and comprehensive quotations to project owners, design institutes, and contractors.
B: We supply our products to contractors, building companies, material suppliers, and trading companies.
C: We collaborate with global peer companies, offering our exceptional formwork products.
Q4: How long does it take to design and quote after receiving the structural drawing?
A: Typically, it takes
3
~7 days, depending on the specific requirements of the construction project.
Q5: How long does it take to manufacture the products after contract signing?
A: Generally, it takes 30~60 days, depending on the type and quantity of products to be produced.
Q6: What are your terms of payment?
A: 30% T/T in advance, balance before shipment.