Basic Info.
Model NO. |
AY86,AY106,AY126, |
Material |
Steel Wood |
Type |
Pier pillar formwork |
Specification |
Q235B |
Panel thickness |
6mm |
Width |
500-6000mm |
Maxmum lateral pressure |
80 kn/square meter |
Height |
2000mm |
Guardrail height |
1200mm |
Appliation scope |
Roads,Railways,Water conservancy |
Number of Platform |
2m/layer |
Width of Operating Platform |
900mm |
Transport Package |
Package Box, Steel Pallet, Steel Frame, Container |
Brand |
Aoyu |
Origin |
China |
Production Capacity |
14000square meter/Month |
Product Description
Steel Formwork System
Steel formwork is robust and long-lasting, making it an ideal solution for repetitive use in construction projects. This system is user-friendly, allowing for quick assembly and erection. With standardized shapes and structures, it perfectly suits projects requiring consistent structural elements, such as high-rise buildings, roads, and bridges.
Packaging:
1. Typically, the total net weight of a loaded container ranges from 22 tons to 25 tons. This must be verified before loading.
2. Various packaging methods are employed based on the product type:
---Bundles: Used for timber beams, steel props, tie rods, etc.
---Pallet: Smaller components are bagged and then placed on pallets.
---Wooden cases: Available upon customer request.
---Bulk: Irregularly shaped goods will be loaded in bulk within the container.
Delivery:
1. Production: For a full container order, production typically takes 20-30 days after receiving the customer's down payment.
2. Transportation: The delivery time is contingent upon the destination port.
3. Special requirements may entail further negotiation.
FAQ
Q1: Are you a trading company or manufacturer?
A: We are a specialized stencil manufacturing company with two dedicated factories.
Q2: What services do you provide?
A: We design and manufacture formwork products specifically for
bridges and tunnels.
Q3: How can you assist us?
A: We provide expert advice, detailed formwork layout designs, and competitive quotations to project owners, design institutes, and contractors.
B: We supply our high-quality products to contractors, construction companies, material suppliers, and trading firms.
C: We also support our international peers by offering our premium formwork products.
Q4: How long does it take to create a preliminary design and quote after receiving the structural drawing?
A: Generally, it takes
3
-7 days, depending on the specific project requirements.
Q5: How long does production take after contract signing?
A: Typically, production takes 30-60 days based on the type and quantity of the products ordered.
Q6: What are your payment terms?
A: We require 30% T/T in advance, with the balance due before shipment.