• Concrete Formwork System for Construction Projects
  • Concrete Formwork System for Construction Projects
  • Concrete Formwork System for Construction Projects
  • Concrete Formwork System for Construction Projects
  • Concrete Formwork System for Construction Projects
  • Concrete Formwork System for Construction Projects

Concrete Formwork System for Construction Projects

After-sales Service: Yes
Warranty: One Year
Certification: ISO
Material: Steel
Type: Column Formwork
ODM or OEM: Yes
Customization:
Manufacturer/Factory
Diamond Member Since 2024

Suppliers with verified business licenses

Beijing, China
High Repeat Buyers Choice
More than 50% of buyers repeatedly choose the supplier
Cooperated with Fortune 500
This supplier has Cooperated with Fortune 500 companies
Patents Awarded
The supplier had awarded 3 patents, you can check the Audit Report for more information
Management Certification
The supplier has quality management system certification, including:
ISO9001:2015 certificate
ISO14001
ISO45001:2018 certificate
to see all verified strength labels (18)

Basic Info.

Model NO.
Column template
Size
Customized
Thickness
Customized
Transport Package
Container
Origin
Aoyu
HS Code
7308900000
Production Capacity
160000square Meters/Year

Product Description

Basic Info.
Model NO. AY86,AY106,AY126, Material Steel Wood
Type Pier pillar formwork Specification Q235B
Panel thickness 6mm Width 500-6000mm
Maxmum lateral pressure 80 kn/square meter Height 2000mm
Guardrail height 1200mm Appliation scope Roads,Railways,Water conservancy
Number of Platform 2m/layer Width of Operating Platform 900mm
Transport Package Package Box, Steel Pallet, Steel Frame, Container Brand Aoyu
Origin China Production Capacity 14000square meter/Month
 

Product Description

Steel Formwork System

Our Steel Formwork System stands out for its exceptional strength and durability, making it ideal for multiple reuses in construction projects. Designed for ease of assembly and erection, it features a fixed shape and structure. This makes it an excellent choice for projects requiring a high quantity of identical-shaped structures, such as high-rise buildings, roads, and bridges, thereby ensuring efficiency and consistency.
Concrete Formwork System for Construction Projects
Concrete Formwork System for Construction Projects
Concrete Formwork System for Construction Projects
Concrete Formwork System for Construction Projects
 

Packaging:

1. Typically, the net weight for a fully loaded container ranges between 22 to 25 tons. This needs to be confirmed prior to loading.
2. We utilize different packaging methods tailored to each product:
---Bundles: Used for items like timber beams, steel props, and tie rods.
---Pallet: Smaller parts are first placed in bags, then organized on pallets.
---Wooden cases: Available upon customer request, providing additional protection.
---Bulk: Irregularly shaped goods will be loaded in bulk within the container.
Delivery:
1. Production: For a full container order, production typically takes 20-30 days after receiving the customer's down payment.
2. Transportation: The duration depends on the destination port.
3. Special requirements can be addressed through negotiation.

FAQ
Q1: Are you a trading company or a manufacturer?
A: We are a professional stencil making company with our own two factories.

Q2: What do you do?
A: We specialize in the design and manufacture of formwork products.Our products are primarily used for bridges and tunnels.

Q3: What can you do for us?
A: We provide expert suggestions, detailed drawings of formwork layouts, and competitive quotations to owners, design institutes, and contractors involved in construction projects.
B: We sell our high-quality products to contractors, construction companies, material suppliers, and trading companies.
C: We also support our global partners with our superior formwork products.

Q4: How long does it take to create a brief design and quotation after we supply the structural drawing?
A: Typically, it takes3
~7 days, depending on the specific requirements of the construction project.

Q5: How long does it take to manufacture the products after the contract is signed?
A: Generally, production takes 30~60 days, depending on the type and quantity of products needed.

Q6: What are your terms of payment?
A: We require a 30% T/T payment in advance, with the balance due before shipment.

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now

You Might Also Like

Product Categories

Diamond Member Since 2024

Suppliers with verified business licenses

Manufacturer/Factory
Plant Area
>2000 square meters
Management System Certification
ISO 9001, ISO 14001