Basic Info.
Model NO. |
AY86,AY106,AY126, |
Material |
Steel Wood |
Type |
Pier pillar formwork |
Specification |
Q235B |
Panel thickness |
6mm |
Width |
500-6000mm |
Maxmum lateral pressure |
80 kn/square meter |
Height |
2000mm |
Guardrail height |
1200mm |
Appliation scope |
Roads,Railways,Water conservancy |
Number of Platform |
2m/layer |
Width of Operating Platform |
900mm |
Transport Package |
Package Box, Steel Pallet, Steel Frame, Container |
Brand |
Aoyu |
Origin |
China |
Production Capacity |
14000square meter/Month |
Product Description
Steel Formwork System
Our Steel Formwork System is designed to be robust and long-lasting, making it highly reusable in various construction projects. Its ease of assembly and rigid structure make it ideal for projects requiring numerous identical structures, such as high-rise buildings, roads, and bridges.
Packaging:
1. Typically, the net weight of a loaded container ranges from 22 to 25 tons. Precise confirmation is necessary before loading.
2. We employ different packaging methods tailored to various products:
---Bundles: Suitable for timber beams, steel props, tie rods, etc.
---Pallet: Small parts are bagged and then placed on pallets.
---Wooden cases: Available upon customer request.
---Bulk: Irregular goods are loaded in bulk within the container.
Delivery:
1. Production: For a full container, we typically require 20-30 days post receipt of customer's down payment.
2. Transportation: Dependent on the destination port's charge.
3. Special requirements can be negotiated.
FAQ
Q1: Are you a trading company or manufacturer?
A: We are a professional stencil-making company, boasting our own two factories.
Q2: What services do you offer?
A: We specialize in designing and manufacturing formwork products utilized in
bridge and tunnel construction.
Q3: How can you assist us?
A: We provide expert suggestions, formwork layout drawings, and quotations to project owners, design institutes, and contractors.
B: We supply our products to contractors, building companies, material suppliers, and trading companies.
C: We support our global peers with exceptional formwork products.
Q4: How long does it take to create a basic design and quotation after receiving the structural drawing?
A: Generally, it takes
3
~7 days depending on the specific project requirements.
Q5: How long does it take to manufacture the products post-contract signing?
A: Typically, it takes 30~60 days, depending on the product type and quantity.
Q6: What are your payment terms?
A: We require 30% T/T in advance, with the balance due before shipment.