Basic Info.
Model NO. |
AY86,AY106,AY126, |
Material |
Steel Wood |
Type |
Pier pillar formwork |
Specification |
Q235B |
Panel thickness |
6mm |
Width |
500-6000mm |
Maxmum lateral pressure |
80 kn/square meter |
Height |
2000mm |
Guardrail height |
1200mm |
Appliation scope |
Roads,Railways,Water conservancy |
Number of Platform |
2m/layer |
Width of Operating Platform |
900mm |
Transport Package |
Package Box, Steel Pallet, Steel Frame, Container |
Brand |
Aoyu |
Origin |
China |
Production Capacity |
14000square meter/Month |
Product Description
Steel Formwork System
Our Steel Formwork is an epitome of strength and durability, guaranteeing multiple reuses across various construction projects. Its ease of assembly and erection ensures efficiency. With its fixed shape and structure, it is the ideal choice for projects requiring large quantities of uniform structures such as high-rise buildings, roads, and bridges.
Packaging:
1. Typically, the total net weight of a loaded container ranges from 22 to 25 tons, which must be confirmed before loading.
2. We employ different packaging methods for various products to ensure their safety and integrity:
---Bundles: Ideal for timber beams, steel props, tie rods, and similar items.
---Pallet: Small parts are securely placed in bags and then arranged on pallets.
---Wooden cases: Available upon customer's request for added protection.
---Bulk: Suitable for loading irregularly shaped goods in bulk within the container.
Delivery:
1. Production: For a full container, the production timeline is typically 20-30 days post receipt of the customer's down payment.
2. Transportation: Delivery times vary depending on the destination charge port.
3. Special requirements can be discussed and negotiated to meet your needs.
FAQ
Q1: Are you a trading company or manufacturer?
A: We are a professional stencil-making company with two fully-operational factories.
Q2: What do you specialize in?
A: We specialize in the design and manufacture of formwork products used in
the construction of bridges and tunnels.
Q3: How can you assist us?
A: We provide expert suggestions, detailed formwork layout drawings, and competitive quotations to project owners, design institutes, and contractors.
B: Our products are available for sale to contractors, building companies, material suppliers, and trading companies.
C: We also support our global peers with our superior formwork products, ensuring their projects meet the highest standards.
Q4: How long does it take to prepare a brief design and quotation after we provide the structural drawing?
A: Generally, it takes
3
~7 days, depending on the specific requirements of the construction project.
Q5: How long does it take to manufacture the products after the contract is signed?
A: Typically, it takes 30~60 days, depending on the type and quantity of products required.
Q6: What are your terms of payment?
A: Our terms are 30% T/T in advance, with the balance due before shipment.