Basic Info.
Model NO. |
AY86,AY106,AY126, |
Material |
Steel Wood |
Type |
Pier pillar formwork |
Specification |
Q235B |
Panel thickness |
6mm |
Width |
500-6000mm |
Maxmum lateral pressure |
80 kn/square meter |
Height |
2000mm |
Guardrail height |
1200mm |
Appliation scope |
Roads,Railways,Water conservancy |
Number of Platform |
2m/layer |
Width of Operating Platform |
900mm |
Transport Package |
Package Box, Steel Pallet, Steel Frame, Container |
Brand |
Aoyu |
Origin |
China |
Production Capacity |
14000square meter/Month |
Product Description
Steel Formwork System
Our Steel Formwork System is renowned for its strength and durability, allowing for multiple reuses in construction projects. This system is not only easy to assemble and erect but also optimally designed for projects requiring a large quantity of uniformly shaped structures. It is ideal for high-rise buildings, roads, bridges, and more.
Packaging:
1. Before loading, the total net weight of the container, generally ranging between 22 and 25 tons, must be confirmed.
2. Tailored packaging solutions for varied product types:
---Bundles: Suitable for timber beams, steel props, tie rods, etc.
---Pallet: Small parts are bagged and palletized for secure transport.
---Wooden cases: Available upon customer's request for additional protection.
---Bulk: Irregularly shaped goods are loaded in bulk within the container.
Delivery:
1. Production: For a full container, we typically require 20-30 days post receipt of customer's down payment.
2. Transportation: Duration varies based on the destination port.
3. Special requirements are subject to negotiation.
FAQ
Q1: Are you a trading company or manufacturer?
A: We are a professional stencil making company with two proprietary factories.
Q2: What do you do?
A: We specialize in the design and manufacture of formwork products used for
bridges and tunnels.
Q3: What can you do for us?
A: We provide expert suggestions, detailed formwork layout drawings, and comprehensive quotations to project owners, design institutes, or contractors.
B: Our products are available for purchase by contractors, building companies, material suppliers, and trading companies.
C: We support our global partner companies with our exceptional formwork products.
Q4: How long does it take to create a brief design and quotation after we provide the structural drawing?
A: Typically, it takes
3
~7 days, depending on the specific requirements of the construction project.
Q5: How long does it take to manufacture the products after the contract is signed?
A: Generally, it takes 30~60 days, contingent on the type and quantity of products to be manufactured.
Q6: What are your terms of payment?
A: 30% T/T in advance, with the balance due before shipment.