Basic Info.
Model NO. |
AY86,AY106,AY126, |
Material |
Steel Wood |
Type |
Pier pillar formwork |
Specification |
Q235B |
Panel thickness |
6mm |
Width |
500-6000mm |
Maxmum lateral pressure |
80 kn/square meter |
Height |
2000mm |
Guardrail height |
1200mm |
Appliation scope |
Roads,Railways,Water conservancy |
Number of Platform |
2m/layer |
Width of Operating Platform |
900mm |
Transport Package |
Package Box, Steel Pallet, Steel Frame, Container |
Brand |
Aoyu |
Origin |
China |
Production Capacity |
14000square meter/Month |
Product Description
Steel Formwork System
Our steel formwork system stands out for its robustness and reusability, making it an economical choice for construction projects. Its ease of assembly and erection, along with a standardized shape, makes it ideal for projects requiring uniform structures, such as high-rise buildings, roads, and bridges.
Packaging:
1. To ensure optimal safety and efficiency, the total net weight of the loaded container typically ranges from 22 to 25 tons. This must be confirmed prior to loading.
2. We use various packaging methods tailored for different products to ensure their safe transport:
---Bundles: Perfect for timber beams, steel props, tie rods, and similar items.
---Pallet: Small components are first placed in bags and then organized on pallets.
---Wooden cases: Available upon customer's request for added protection.
---Bulk: Irregularly shaped goods are loaded in bulk within the container.
Delivery:
1. Production: For a full container order, we typically require 20-30 days to complete production after receiving the customer's down payment.
2. Transportation: Delivery time varies depending on the destination charge port.
3. Special requirements are subject to negotiation to ensure all your needs are met.
FAQ
Q1: Are you a trading company or a manufacturer?
A: We are a professional stencil-making company with two dedicated factories.
Q2: What services do you provide?
A: We specialize in designing and manufacturing formwork products used in
infrastructure projects such as bridges and tunnels.
Q3: How can you assist us?
A: We provide expert suggestions, detailed formwork layout drawings, and competitive quotations to project owners, design institutes, or contractors.
B: We sell our high-quality products to contractors, building companies, material suppliers, or trading companies.
C: We support our global peers by supplying exceptional formwork products.
Q4: How long does it take to create a brief design and quotation after receiving the structural drawing?
A: Generally, it takes
3
~7 days, depending on the specific requirements of the construction project.
Q5: How long does it take to manufacture the products after the contract is signed?
A: Typically, it takes 30~60 days, depending on the type and quantity of products ordered.
Q6: What are your terms of payment?
A: We require 30% T/T in advance, with the balance due before shipment.