Basic Info.
Model NO. |
AY86,AY106,AY126, |
Material |
Steel Wood |
Type |
Pier pillar formwork |
Specification |
Q235B |
Panel thickness |
6mm |
Width |
500-6000mm |
Maxmum lateral pressure |
80 kn/square meter |
Height |
2000mm |
Guardrail height |
1200mm |
Appliation scope |
Roads,Railways,Water conservancy |
Number of Platform |
2m/layer |
Width of Operating Platform |
900mm |
Transport Package |
Package Box, Steel Pallet, Steel Frame, Container |
Brand |
Aoyu |
Origin |
China |
Production Capacity |
14000square meter/Month |
Product Description
Steel Formwork System
Our steel formwork system is renowned for its exceptional strength and durability, allowing it to be reused multiple times across various construction projects. It is designed for ease of assembly and erection, maintaining a fixed shape and structure that is ideal for projects requiring numerous identical structural elements, such as high-rise buildings, roads, and bridges.
Packaging:
1. The total net weight of a fully loaded container generally ranges from 22 to 25 tons. This must be confirmed prior to loading.
2. We utilize different packaging methods tailored to specific products:
---Bundles: Suitable for timber beams, steel props, tie rods, etc.
---Pallet: Smaller parts are bagged and then placed on pallets.
---Wooden cases: Available upon customer request.
---Bulk: Irregular goods will be loaded in bulk within the container.
Delivery:
1. Production: For a full container, production typically requires 20-30 days following receipt of the customer's down payment.
2. Transportation: The time required is subject to the destination port's charges.
3. Special requirements will be addressed through negotiation.
FAQ
Q1: Are you a trading company or manufacturer?
A: We are a specialized stencil making company, boasting ownership of two factories.
Q2: What is the scope of your services?
A: We specialize in designing and manufacturing formwork products that are essential for
constructing bridges and tunnels.
Q3: What services can you offer us?
A: We provide valuable suggestions, detailed formwork layout drawings, and comprehensive quotations to project owners, design institutes, and contractors.
B: Our products are available for sale to contractors, building companies, material suppliers, and trading companies.
C: We support our global peers with our top-tier formwork products.
Q4: How long does it take to prepare a design and quotation after receiving the structural drawing?
A: Typically, it takes
3
~7 days to fulfill specific construction project requirements.
Q5: What is the production timeline following contract signing?
A: Generally, the manufacturing process takes 30~60 days, contingent on the type and volume of the products ordered.
Q6: What are your terms of payment?
A: We require a 30% T/T payment in advance, with the balance due before shipment.