Basic Info.
Model NO. |
AY86,AY106,AY126, |
Material |
Steel Wood |
Type |
Pier pillar formwork |
Specification |
Q235B |
Panel thickness |
6mm |
Width |
500-6000mm |
Maxmum lateral pressure |
80 kn/square meter |
Height |
2000mm |
Guardrail height |
1200mm |
Appliation scope |
Roads,Railways,Water conservancy |
Number of Platform |
2m/layer |
Width of Operating Platform |
900mm |
Transport Package |
Package Box, Steel Pallet, Steel Frame, Container |
Brand |
Aoyu |
Origin |
China |
Production Capacity |
14000square meter/Month |
Product Description
Steel Formwork System
Our steel formwork system is the epitome of strength and durability, perfect for repeated use in various construction projects. Its ease of assembly and erection makes it an ideal solution for projects requiring numerous identical structures, such as high-rise buildings, roads, and bridges.
Packaging:
1. Typically, the total net weight of a loaded container ranges between 22 to 25 tons, a detail that must be confirmed prior to loading.
2. We utilize different packaging methods tailored to specific products:
---Bundles: Ideal for timber beams, steel props, and tie rods.
---Pallet: Small parts are secured in bags and placed on pallets.
---Wooden cases: Available upon customer's request.
---Bulk: Irregular goods are loaded in bulk within the container.
Delivery:
1. Production: For a full container, we generally require 20-30 days post receipt of the customer's down payment.
2. Transportation: Dependent on the destination charge port.
3. Special requirements necessitate negotiation.
FAQ
Q1: Are you a trading company or manufacturer?
A: We are a professional stencil manufacturing company, equipped with two proprietary factories.
Q2: What services do you offer?
A: We specialize in the design and manufacturing of formwork products utilized in
bridges and tunnels.
Q3: What can you do for us?
A: We provide expert suggestions, comprehensive formwork layout drawings, and detailed quotations to project owners, design institutes, and contractors.
B: We supply our products to contractors, building companies, material suppliers, and trading companies.
C: We support our global peers with top-tier formwork solutions.
Q4: How long does it take to develop a preliminary design and quotation after we submit the structural drawing?
A: Generally, it takes
3
~7 days, depending on the specific requirements of the construction project.
Q5: How long does it take to manufacture the products post-contract signing?
A: Typically, production time ranges from 30 to 60 days, contingent upon the type and quantity of products ordered.
Q6: What are your payment terms?
A: 30% T/T in advance, with the balance due before shipment.